The Optimal Manufacturing Batch Size with Rework under Time-Varying Demand Process for a Finite Time Horizon

被引:2
|
作者
Musa, Sarah [1 ]
Supadi, Siti Suzlin [1 ]
Omar, Mohd [1 ]
机构
[1] Univ Malaya, Fac Sci, Inst Math Sci, Kuala Lumpur, Malaysia
关键词
Rework; Time-varying demand; Manufacturing cycle; IMPERFECT PRODUCTION PROCESSES; STAGE PRODUCTION SYSTEM; MULTISTAGE PRODUCTION SYSTEM; MODEL;
D O I
10.1063/1.4887745
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
Rework is one of the solutions to some of the main issues in reverse logistic and green supply chain as it reduces production cost and environmental problem. Many researchers focus on developing rework model, but to the knowledge of the author, none of them has developed a model for time-varying demand rate. In this paper, we extend previous works and develop multiple batch production system for time-varying demand rate with rework. In this model, the rework is done within the same production cycle.
引用
收藏
页码:1105 / 1110
页数:6
相关论文
共 50 条