共 50 条
- [2] The Optimal Manufacturing Batch Size with Rework under Time-Varying Demand Process for a Finite Time Horizon [J]. PROCEEDINGS OF THE 21ST NATIONAL SYMPOSIUM ON MATHEMATICAL SCIENCES (SKSM21): GERMINATION OF MATHEMATICAL SCIENCES EDUCATION AND RESEARCH TOWARDS GLOBAL SUSTAINABILITY, 2014, 1605 : 1105 - 1110
- [7] Just-in-time manufacturing in Ghana [J]. INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2001, 101 (3-4) : 106 - 113
- [8] SCHEDULING FOR JUST-IN-TIME MANUFACTURING [J]. ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1989, 16 (02): : 117 - 124
- [9] Just-in-time manufacturing in Ghana [J]. Industrial Management and Data Systems, 2001, 101 (3-4): : 106 - 113