PROJECT PORTFOLIO SELECTION IN A COLOMBIAN HOLDING COMPANY

被引:0
|
作者
Mican, Camilo [1 ,2 ]
Tereso, Anabela [1 ]
Fernandes, Gabriela [1 ]
Araujo, Madalena [1 ]
机构
[1] Univ Minho, ALGORITMI Res Ctr, Dept Prod & Syst, Guimaraes, Portugal
[2] Univ Valle, Ind Engn Sch, Cali, Colombia
关键词
Multicriteria analysis; Promethee I method; Project portfolio management; Strategic portfolio;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
The adequate project selection allows companies to invest resources in specific initiatives that allow them to achieve their strategic objectives and to become more competitive. In contrast, non-adequate projects selection can burden the organizations with large investments that do not impact positively in the organization in general. This paper shows an application of Promethee I method, fifth version, as a multi-criteria method to support the strategic projects selection process, and a sensitivity analysis that were both carried out at the beginning of the planning period in a Colombian holding company. The application of Promethee I in a base scenario, and the development of two alternative scenarios allowed to identify that in the case study's portfolio there are projects with a very high preference, regardless of the criteria weight. Similarly, it allowed to identify the least preferred projects. These results are an important input for projects selection decision-making to be carried out by the holding company board of directors. Moreover, it was identified that the case study's holding company should focus efforts on the relative weights definition and on the measurement scale of each criterion, as this has a significant impact on the results obtained.
引用
收藏
页码:135 / 140
页数:6
相关论文
共 50 条
  • [21] A bi-level multi-follower optimization model for R&D project portfolio: an application to a pharmaceutical holding company
    Faraz Salehi
    S. Mohammad J. Mirzapour Al-E-Hashem
    S. Mohammad Moattar Husseini
    S. Hassan Ghodsypour
    Annals of Operations Research, 2023, 323 : 331 - 360
  • [22] Managing Underperformance Risk in Project Portfolio Selection
    Hall, Nicholas G.
    Long, Daniel Zhuoyu
    Qi, Jin
    Sim, Melvyn
    OPERATIONS RESEARCH, 2015, 63 (03) : 660 - 675
  • [23] Project Portfolio Selection: From Past to Present
    Iamratanakul, Supachart
    Patanakul, Peerasit
    Milosevic, Dragan
    2008 IEEE INTERNATIONAL CONFERENCE ON MANAGEMENT OF INNOVATION AND TECHNOLOGY, VOLS 1-3, 2008, : 287 - +
  • [24] Project portfolio selection with scheduling: an evolutionary approach
    Martinez-Vega, Daniel A.
    Cruz-Reyes, Laura
    Rangel, Nelson, V
    Gomez S, Claudia G.
    Sanchez S, Patricia
    Perez, Mercedes, V
    INTERNATIONAL JOURNAL OF COMBINATORIAL OPTIMIZATION PROBLEMS AND INFORMATICS, 2019, 10 (01): : 25 - 31
  • [25] Multiobjective project portfolio selection with fuzzy constraints
    Perez, F.
    Gomez, T.
    ANNALS OF OPERATIONS RESEARCH, 2016, 245 (1-2) : 7 - 29
  • [26] Estimation of Downside Risks in Project Portfolio Selection
    Kettunen, Janne
    Salo, Ahti
    PRODUCTION AND OPERATIONS MANAGEMENT, 2017, 26 (10) : 1839 - 1853
  • [27] Project portfolio selection model, a realistic approach
    Urli, Bruno
    Terrien, Francois
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2010, 17 (06) : 809 - 826
  • [28] Software Project Portfolio Selection A Modern Portfolio Theory Based Technique
    Costa, Helio R.
    Barros, Marcio O.
    Rocha, Ana Regina
    22ND INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING & KNOWLEDGE ENGINEERING (SEKE 2010), 2010, : 387 - 392
  • [29] A decision support system for project portfolio selection
    Chu, PYV
    Hsu, YL
    Fehling, M
    COMPUTERS IN INDUSTRY, 1996, 32 (02) : 141 - 149
  • [30] Hybrid framework for investment project portfolio selection
    Rebiasz, Bogdan
    Gawel, Bartlomiej
    Skalna, Iwona
    FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS, 2014, 2014, 2 : 1117 - 1122