Scheduling in iron ore open-pit mining

被引:8
|
作者
Ibrahimov, Maksud [1 ]
Mohais, Arvind [1 ]
Schellenberg, Sven [2 ]
Michalewicz, Zbigniew [1 ,3 ,4 ]
机构
[1] Univ Adelaide, Sch Comp Sci, Adelaide, SA 5005, Australia
[2] RMIT Univ, Sch Comp Sci & IT, Melbourne, Vic, Australia
[3] Polish Acad Sci, Inst Comp Sci, PL-01237 Warsaw, Poland
[4] Polish Japanese Inst Informat Technol, PL-02008 Warsaw, Poland
关键词
Open-pit mining; Scheduling; Metaheuristics; Real-world application; SEARCH ALGORITHM;
D O I
10.1007/s00170-014-5619-8
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
During the last few years, most production-based businesses have been under enormous pressure to improve their top-line growth and bottom-line savings. As a result, many companies are turning to systems and technologies that can help optimise their supply chain activities. In this paper, we discuss a real-world application of scheduling in the mining industry. This is a highly constrained problem with some of the constraints changing over time. The objective is to generate a plan that meets the quality and tonnage targets by utilising the provided equipment and machines. The mathematical model is described in detail, and a three-module complex algorithm based on computational intelligence is proposed. The main software functionality is also described. The developed software is currently in the production use.
引用
收藏
页码:1021 / 1037
页数:17
相关论文
共 50 条
  • [41] Modelling and Optimizing an Open-Pit Truck Scheduling Problem
    Chang, Yonggang
    Ren, Huizhi
    Wang, Shijie
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2015, 2015
  • [42] INCLUSION OF RISK ASSESSMENT IN OPEN-PIT DESIGN AND SCHEDULING
    DENBY, B
    SCHOFIELD, D
    TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY, 1995, 104 : A67 - A71
  • [43] Formula optimization of dust coagulation agent for application in open-pit iron ore mine blasting
    Ma, E. W.
    Wu, Q. S.
    Wu, X. Y.
    Lang, Q. C.
    Cui, Z. J.
    ADVANCES IN ENERGY, ENVIRONMENT AND MATERIALS SCIENCE, 2016, : 581 - 585
  • [44] Aggregation heuristic for the open-pit block scheduling problem
    Jelvez, Enrique
    Morales, Nelson
    Nancel-Penard, Pierre
    Peypouquet, Juan
    Reyes, Patricio
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 249 (03) : 1169 - 1177
  • [45] Designing a Vehicles for Open-Pit Mining with Optimized Scheduling Based on 5G and IoT
    Alaboudi, Abdulellah A.
    INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2021, 21 (03): : 145 - 152
  • [46] A SOLUTION TO THE PROBLEM OF SCHEDULING AND REPLACEMENT IN OPEN-PIT MINES
    WANG, Q
    SEVIM, H
    DETOMI, G
    21ST APPLICATION OF THE COMPUTERS AND OPERATIONS RESEARCH IN THE MINERAL INDUSTRY, 1989, : 662 - 673
  • [47] OPEN-PIT DESIGN AND SCHEDULING BY USE OF GENETIC ALGORITHMS
    DENBY, B
    SCHOFIELD, D
    TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY, 1994, 103 : A21 - A26
  • [48] An integrated approach to open-pit mines production scheduling
    Alipour, Aref
    Khodaiari, Ali Asghar
    Jafari, Ahmad
    Tavakkoli-Moghaddam, Reza
    RESOURCES POLICY, 2022, 75
  • [49] A novel model for sustainable production scheduling of an open-pit mining complex considering waste encapsulation
    Lin J.
    Asad M.W.A.
    Topal E.
    Chang P.
    Huang J.
    Lin W.
    Resources Policy, 2024, 91
  • [50] Estimation of Rock Mass Strength in Open-Pit Mining
    Pavlovich, Anton A.
    Korshunov, Vladimir A.
    Bazhukov, Aleksandr A.
    Melnikov, Nikita Ya
    JOURNAL OF MINING INSTITUTE, 2019, 239 : 502 - 509