共 50 条
- [42] INCLUSION OF RISK ASSESSMENT IN OPEN-PIT DESIGN AND SCHEDULING TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY, 1995, 104 : A67 - A71
- [43] Formula optimization of dust coagulation agent for application in open-pit iron ore mine blasting ADVANCES IN ENERGY, ENVIRONMENT AND MATERIALS SCIENCE, 2016, : 581 - 585
- [45] Designing a Vehicles for Open-Pit Mining with Optimized Scheduling Based on 5G and IoT INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2021, 21 (03): : 145 - 152
- [46] A SOLUTION TO THE PROBLEM OF SCHEDULING AND REPLACEMENT IN OPEN-PIT MINES 21ST APPLICATION OF THE COMPUTERS AND OPERATIONS RESEARCH IN THE MINERAL INDUSTRY, 1989, : 662 - 673
- [47] OPEN-PIT DESIGN AND SCHEDULING BY USE OF GENETIC ALGORITHMS TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY, 1994, 103 : A21 - A26
- [50] Estimation of Rock Mass Strength in Open-Pit Mining JOURNAL OF MINING INSTITUTE, 2019, 239 : 502 - 509