共 50 条
- [41] SIMULATING BACKLOG AND LOAD BUILDING PROCESSES IN A TWO-ECHELON INVENTORY SYSTEM PROCEEDINGS OF THE 2010 WINTER SIMULATION CONFERENCE, 2010, : 1833 - 1845
- [42] Inventory management and delivery of perishable products with stochastic demands and risks consideration 5TH INTERNATIONAL CONFERENCE ON INDUSTRY 4.0 AND SMART MANUFACTURING, ISM 2023, 2024, 232 : 2941 - 2949
- [45] Analysis of two commodity markovian inventory system with lead time Korean Journal of Computational and Applied Mathematics, 2001, 8 (2): : 427 - 438
- [47] Analysis of two commodity Markovian inventory system with lead time Korean Journal of Computational and Applied Mathematics, 2001, 8 (02): : 427 - 438
- [49] A continuous review perishable system with renewal demands Annals of Operations Research, 2006, 143 : 211 - 225
- [50] Optimal inventory system with two backlog costs in response to a discount offer: corrections and complements Operational Research, 2018, 18 : 97 - 104