Hybrid fuzzy decision making approach for wind-powered pumped storage power plant site selection: A case study

被引:37
|
作者
Ahmadi, Sayyed Hamid Reza [1 ]
Noorollahi, Younes [2 ,3 ]
Ghanbari, Sasan [3 ]
Ebrahimi, Morteza [1 ]
Hosseini, Hossein [2 ]
Foroozani, Ahmad [1 ]
Hajinezhad, Ahmad [2 ]
机构
[1] Univ Tehran, Fac New Sci & Technol, Dept Network Sci & Technol, Tehran, Iran
[2] Univ Tehran, Fac New Sci & Technol, Dept Renewable Energies & Environm Engn, Tehran, Iran
[3] Univ Tehran, Fac New Sci & Technol, Energy Modelling & Sustainable Energy Syst METSAP, Tehran, Iran
基金
美国国家科学基金会;
关键词
Wind energy; Fuzzy ANP; Fuzzy VIKOR; Site selection; GIS; Pumped-storage systems; ANALYTIC HIERARCHY PROCESS; RENEWABLE ENERGY; MULTICRITERIA ANALYSIS; MCDM METHODS; SOLAR FARMS; GIS; VIKOR; FRAMEWORK; SYSTEMS; MODEL;
D O I
10.1016/j.seta.2020.100838
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Combining wind power with pumped-storage systems is trustworthy for reducing the unreliability of wind energy, caused by the variable nature of the wind for contributing to the grid's peak shaving. Locating suitable sites for constructing both wind parks and pumped-storage systems for peak shaving is a delicate problem-solving. For solving such problems, a wide range of technical, financial, and environmental criteria should be taken into account. A two-step decision framework combining GIS, Analytic Network Process (ANP) and fuzzy VIKOR are proposed in this paper to solve the problem for locating the suitable sites for constructing a wind-powered pump storage plant. In the first step, a GIS database is developed to locate a handful potential sites within the study area. As there are different and even conflicting criteria involved with site selection problem. In the second step, we used an MCDM approach of fuzzy analytic network process (ANP) and fuzzy VIKOR to rank these potential sites. To establish an evaluation system, four major clusters of criteria are introduced (wind farm, water reservoir, water pump and power production) with more addition related sub-criteria. Comprehensive guidelines are formulated through a hierarchical procedure so a data-driven, multi-aspect decision framework could be presented with the goal of improving the benefits of integrated renewable energies. The results show that, the Gilane-Gharb dam is the most promising site within the study area. This site provides a net area of 13.2 km(2) for constructing a wind farm with an approximate power capacity of 31 MW. The proposed procedure in this is a framework that are provide a theoretical reference for resolving any multicriteria decision-making problem by introducing the appropriate criteria.
引用
收藏
页数:14
相关论文
共 50 条
  • [41] A new hybrid multi-criteria decision-making approach for location selection of sustainable offshore wind energy stations: A case study
    Abdel-Basset, Mohamed
    Gamal, Abduallah
    Chakrabortty, Ripon K.
    Ryan, Michael
    JOURNAL OF CLEANER PRODUCTION, 2021, 280
  • [42] Study of decision framework of offshore wind power station site selection based on ELECTRE-III under intuitionistic fuzzy environment: A case of China
    Wu Yunna
    Zhang Jinying
    Yuan Jianping
    Geng Shuai
    Zhang Haobo
    ENERGY CONVERSION AND MANAGEMENT, 2016, 113 : 66 - 81
  • [43] Study on the Optimal Scheduling of a Hybrid Wind-Solar-Pumped Storage Power Generation System
    Lv, You
    Yu, Xiangyang
    Yue, Tonggengri
    PROCEEDINGS OF 2018 IEEE 3RD ADVANCED INFORMATION TECHNOLOGY, ELECTRONIC AND AUTOMATION CONTROL CONFERENCE (IAEAC 2018), 2018, : 1434 - 1442
  • [44] A suitable site selection for sustainable bioenergy production facility by using hybrid multi-criteria decision making approach, case study: Turkey
    Emeksiz, Cem
    Yuksel, Abdullah
    FUEL, 2022, 315
  • [45] The Hydrogen Energy Infrastructure Location Selection Model: A Hybrid Fuzzy Decision-Making Approach
    Li, Long
    Wang, Shuqi
    Zhang, Shengxi
    Liu, Ding
    Ma, Shengbin
    SUSTAINABILITY, 2023, 15 (13)
  • [46] A novel fuzzy hybrid neutrosophic decision-making approach for the resilient supplier selection problem
    Pamucar, Dragan
    Yazdani, Morteza
    Obradovic, Radojko
    Kumar, Anil
    Torres-Jimenez, Mercedes
    INTERNATIONAL JOURNAL OF INTELLIGENT SYSTEMS, 2020, 35 (12) : 1934 - 1986
  • [47] A robust decision making approach for hydrogen power plant site selection utilizing (R, S)-Norm Pythagorean Fuzzy information measures based on VIKOR and TOPSIS method
    Guleria, Abhishek
    Bajaj, Rakesh Kumar
    INTERNATIONAL JOURNAL OF HYDROGEN ENERGY, 2020, 45 (38) : 18802 - 18816
  • [49] The fuzzy TOPSIS and generalized Choquet fuzzy integral algorithm for nuclear power plant site selection - a case study from Turkey
    Kurt, Unal
    JOURNAL OF NUCLEAR SCIENCE AND TECHNOLOGY, 2014, 51 (10) : 1241 - 1255
  • [50] A joint short-term operation model for wind power and hybrid pumped-storage hydropower plant
    Luo B.
    Chen Y.
    Miao S.
    Liu Z.
    Liu X.
    Shuili Xuebao/Journal of Hydraulic Engineering, 2023, 54 (08): : 955 - 966