共 50 条
- [42] GANTRY SCHEDULING FOR TWO-MACHINE ONE-BUFFER COMPOSITE WORK CELL BY REINFORCEMENT LEARNING PROCEEDINGS OF THE ASME 12TH INTERNATIONAL MANUFACTURING SCIENCE AND ENGINEERING CONFERENCE - 2017, VOL 4, 2017,
- [45] Lead-time oriented production control policies in two-machine production lines IFAC PAPERSONLINE, 2015, 48 (03): : 2399 - 2404
- [46] On the Modeling and Stability Analysis of Switched Two-Machine Power Systems 2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 7192 - +