共 50 条
- [41] Optimization of underground mining development direction about end slope coal pillar recovery of open-pit coal mine Ding, X.-P. (ccridxp@163.com), 1923, China Coal Society (38):
- [42] Uplift mechanism of the bottom of open pit after the transition from open-pit mining to underground mining in Longshou mine Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2015, 32 (04): : 677 - 682
- [44] INCREASED OPEN PIT AND UNDERGROUND COAL PRODUCTIVITY THROUGH UTILISATION OF ADVANCED MINING SYSTEMS AT ULAN MINE. Mining Technology, 1988, 70 (810): : 110 - 118
- [45] Technological innovation and engineering practice of damage reduction mining and ecosystem restoration in open-pit coal mine GLOBAL SUSTAINABILITY, 2024, 7
- [46] Study on division of mining area under influence of production capacity increasing of open-pit coal mine Meitan Kexue Jishu/Coal Science and Technology (Peking), 2023, 51 (11): : 63 - 70
- [47] Design and selection criteria of surface continuous miners for open pit mining, using Turkish coal mine as example Prace Naukowe Instytutu Gornictwa Politechniki Wroclawskiej, 1998, (82): : 40 - 48
- [48] Analysis on stability of land parcel of Fushun mining group headquarters by exploitation of west open-pit mine FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING III, PTS 1-3, 2013, 368-370 : 1610 - +
- [50] Opening of the Hambach Open-Pit Brown Coal Mine and the Mine Infrastructure. VGB-Kraftwerkstechnik, 1979, 59 (11): : 889 - 898