OPTIMIZING TRACK INFRASTRUCTURE AVAILABILITY

被引:0
|
作者
Mlinaric, Tomislav Josip [1 ]
Pirnar, Miran [2 ]
机构
[1] Univ Zagreb, Fac Transport & Traff Sci, HR-10000 Zagreb, Croatia
[2] Slovenske Zeleznice Doo, SI-1506 Ljubljana, Slovenia
来源
PROMET-TRAFFIC & TRANSPORTATION | 2009年 / 21卷 / 02期
关键词
liberalization; route leasing; quality deterioration; track availability;
D O I
暂无
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
Failure to realize the schedule which is primarily reflected in train delays is the direct consequence of insufficient availability of capacities of the current railway infrastructure which are generated by low level of usable quality of the track network in general. The aim of the research presented in this paper is to determine the method of optimal interventions of the rail infrastructure managers and traffic control activities on the reduction of the influence of slow runs and line closures thus ensuring a sufficient number of rail routes for the customers' needs and consequently higher quality realization of the schedule. The paper gives a concrete presentation of the volume of slow runs and line closures, calculation of reducing the level of railway capacities with a simulation and the result of this condition on the capacity of the concrete railway line and the proposal of a model for organizing an expert group within the traffic control activities for the fastest possible elimination of these nagative phenomena.
引用
收藏
页码:113 / 121
页数:9
相关论文
共 50 条
  • [1] Availability Approach to Optimizing Railway Track Renewal Operations
    Caetano, Luis Filipe
    Teixeira, Paulo Fonseca
    [J]. JOURNAL OF TRANSPORTATION ENGINEERING, 2013, 139 (09) : 941 - 948
  • [2] Optimizing the Energy Production Infrastructure Considering Uncertainty in Fossil Resource Availability
    Flores, Julio
    Laura Cunico, Maria
    Analia Rodriguez, Maria
    Vecchietti, Aldo
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2014, 53 (44) : 16984 - 17001
  • [3] Optimizing your computing infrastructure
    Anon
    [J]. Research and Development (Barrington, Illinois), 2001, 43 (09):
  • [4] OPTIMIZING IT INFRASTRUCTURE BY VIRTUALIZATION APPROACH
    Budiman, Thomas
    Suroso, Jarot S.
    [J]. IAES INTERNATIONAL CONFERENCE ON ELECTRICAL ENGINEERING, COMPUTER SCIENCE AND INFORMATICS, 2017, 190
  • [5] Measuring and Optimizing for Infrastructure Endurance
    Bartels, Louis B.
    Betz, Trevor S.
    Grussing, Michael N.
    [J]. JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2024, 38 (04)
  • [6] THE IMPORTANCE OF INDUSTRIAL TRACK IN RAILWAY INFRASTRUCTURE
    Alduk, Waldemar
    Dimter, Sanja
    Dolacek-Alduk, Zlata
    [J]. ROAD AND RAIL INFRASTRUCTURE II, 2012, : 509 - 515
  • [7] BIS - Track infrastructure information system
    Backstrom, J
    [J]. COMPUTERS IN RAILWAYS V, VOL 1: RAILWAY SYSTEMS AND MANAGEMENT, 1996, : 13 - 22
  • [9] Availability analysis of railway track circuits
    Patra, A. P.
    Kumar, U.
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2010, 224 (F3) : 169 - 177
  • [10] Increasing the availability of track maintenance machinery
    Flatscher, Peter Josef
    [J]. Eisenbahningenieur, 2002, 53 (09): : 50 - 59