共 50 条
- [31] THE STUDY ON PERFORMANCE EVALUATION BASED ON AHP-FUZZY [J]. PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-6, 2009, : 2750 - 2753
- [32] A Study of AHP-Fuzzy Comprehensive Evaluation on the Development of Eco-Enterprise [J]. 2008 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (15TH), VOLS I AND II, CONFERENCE PROCEEDINGS, 2008, : 219 - 224
- [33] The Establishment of AHP-Fuzzy Model for Comprehensive Evaluation of "City Obesity" Degree [J]. PROCEEDINGS OF THE 2014 INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND ELECTRONIC TECHNOLOGY, 2015, 6 : 56 - 62
- [34] Application of AHP-FUZZY in Analyzing and Evaluating Occupational Hazards of Rolling Enterprise [J]. ADVANCES IN CHEMICAL, MATERIAL AND METALLURGICAL ENGINEERING, PTS 1-5, 2013, 634-638 : 3660 - 3664
- [35] Efficiency Assessment on the Incremental and Stock PPP Projects-Based on AHP-Fuzzy Comprehensive Method under "Multiple Participation" [J]. INTERNATIONAL CONFERENCE ON ECONOMICS, MANAGEMENT ENGINEERING AND MARKETING (EMEM 2017), 2017, : 142 - 149
- [36] Improvement of the intelligent decision-making model based on AHP-fuzzy method [J]. Proceedings of 2006 International Conference on Artificial Intelligence: 50 YEARS' ACHIEVEMENTS, FUTURE DIRECTIONS AND SOCIAL IMPACTS, 2006, : 330 - 332
- [37] Tunnel rockburst proneness study based on AHP-FUZZY method and field test [J]. Electronic Journal of Geotechnical Engineering, 2014, 19 (0A): : 117 - 128
- [38] Research on the Distribution of Frozen soil in Naqu Region Based on the AHP-Fuzzy Method [J]. 4TH INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY RESOURCES AND ENVIRONMENT ENGINEERING, 2019, 237
- [39] Tunnel rockburst proneness study based on AHP-FUZZY method and field test [J]. Electronic Journal of Geotechnical Engineering, 2014, 19 A : 117 - 128