Evaluating Waterway Transit Capacity Based on AHP-Fuzzy Comprehensive Method

被引:0
|
作者
Hou, Haiqiang [1 ]
Yu, Yuhuan [2 ]
Xu, Wuxiong [2 ]
Li, Yicheng [2 ]
机构
[1] Wuhan Univ Technol, 11 Jianguomen St, Beijing, Peoples R China
[2] Wuhan Univ Technol, Wuhan, Hubei, Peoples R China
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In order to quantitatively evaluate the waterway transit capacity, using traffic flow theory for reference, combined with the characteristics of waterway transport, a multi-factor and multi-class index evaluation system with speed, traffic density, traffic load ratio, channel patency and waterway transport is set up. A comprehensive evaluation to the waterway transit capacity is made using AHP combined with fuzzy comprehensive evaluation method. The result of index evaluation weights which are determined through AHP shows that: velocity is the primary factor for the waterway transit capacity, and then traffic density, traffic load ratio and waterway transport, followed by the channel patency. The comprehensive analysis is done to the Yangtze River waterway through the application of fuzzy comprehensive evaluation method. The result shows that the transit capacity was in the medium level.
引用
收藏
页码:300 / 305
页数:6
相关论文
共 50 条
  • [31] Evaluation of Rural Tourism Resources Based on AHP-Fuzzy Mathematical Comprehensive Model
    Yang, Shihe
    Kong, Xiangtong
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [32] Enterprise Electric Energy Efficiency Evaluation based on AHP-Fuzzy Method
    Zhang, Y.
    Bai, C. F.
    Han, X. Y.
    [J]. 2018 CHINA INTERNATIONAL CONFERENCE ON ELECTRICITY DISTRIBUTION (CICED), 2018, : 2856 - 2860
  • [33] THE STUDY ON PERFORMANCE EVALUATION BASED ON AHP-FUZZY
    Han, Na
    Ji, Xiang-Jun
    [J]. PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-6, 2009, : 2750 - 2753
  • [34] Tunnel rockburst proneness study based on AHP-FUZZY method and field test
    Li, Zhigang
    Li, Bo
    Han, Xu
    Song, Wanpeng
    [J]. Electronic Journal of Geotechnical Engineering, 2014, 19 G : 117 - 121
  • [35] The Establishment of AHP-Fuzzy Model for Comprehensive Evaluation of "City Obesity" Degree
    Xiang, Suying
    Li, Xiaofeng
    [J]. PROCEEDINGS OF THE 2014 INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND ELECTRONIC TECHNOLOGY, 2015, 6 : 56 - 62
  • [36] A Study of AHP-Fuzzy Comprehensive Evaluation on the Development of Eco-Enterprise
    Xu Jian-zhong
    Wang Li-jing
    Lu Jun
    [J]. 2008 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (15TH), VOLS I AND II, CONFERENCE PROCEEDINGS, 2008, : 219 - 224
  • [37] Application of AHP-FUZZY in Analyzing and Evaluating Occupational Hazards of Rolling Enterprise
    Yang, Xiaoni
    Shang, Xuguang
    [J]. ADVANCES IN CHEMICAL, MATERIAL AND METALLURGICAL ENGINEERING, PTS 1-5, 2013, 634-638 : 3660 - 3664
  • [38] Efficiency Assessment on the Incremental and Stock PPP Projects-Based on AHP-Fuzzy Comprehensive Method under "Multiple Participation"
    Li, Shu-Juan
    Yang, Xin-Yue
    [J]. INTERNATIONAL CONFERENCE ON ECONOMICS, MANAGEMENT ENGINEERING AND MARKETING (EMEM 2017), 2017, : 142 - 149
  • [39] Tunnel rockburst proneness study based on AHP-FUZZY method and field test
    Li, Zhigang
    Li, Bo
    Han, Xu
    Song, Wanpeng
    [J]. Electronic Journal of Geotechnical Engineering, 2014, 19 (0A): : 117 - 128
  • [40] Research on the Distribution of Frozen soil in Naqu Region Based on the AHP-Fuzzy Method
    Lv Xuehai
    Qin Chengyun
    Liu Teng
    Chen Zhongguo
    Yan Jubin
    [J]. 4TH INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY RESOURCES AND ENVIRONMENT ENGINEERING, 2019, 237