共 50 条
- [4] New Method for Risk Evaluation of Extended Reach Wells PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL. VIII, PTS A AND B, 2010, 8 : 212 - 216
- [5] Cement-integrity-evaluation solution in extended-reach wells in the South China Sea 1600, Society of Petroleum Engineers (SPE) (67):
- [10] Analysis on Human Resource Management Risk Based on Fuzzy Comprehensive Evaluation Method TENTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS I AND II, 2011, : 1142 - 1147