共 50 条
- [1] Full scale laboratory testing of replacement orthotropic deck for Verrazano Narrows Bridge [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE-CYCLE OPTIMIZATION, 2010, : 3519 - 3521
- [3] Laboratory Fatigue Evaluation of Replacement Orthotropic Deck for a Signature Bridge [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, RESILIENCE AND SUSTAINABILITY, 2012, : 3769 - 3775
- [4] Full-scale fatigue test of the Williamsburg Bridge orthotropic deck [J]. BUILDING AN INTERNATIONAL COMMUNITY OF STRUCTURAL ENGINEERS, VOLS 1 AND 2, 1996, : 329 - 336