An Improved Production Scheduling Algorithm based on Resource Constraints

被引:1
|
作者
Gao, Yan [1 ]
Zhang, Xin [1 ]
Xu, Jianzhong [2 ]
机构
[1] E China Normal Univ, Inst Software & Engn, Shanghai Key Lab Trustworthy Comp, Shanghai 200062, Peoples R China
[2] Nanchang Army Coll, Inst Comp Sci, Nanchang, Jiangxi, Peoples R China
基金
中国国家自然科学基金;
关键词
Task Scheduling; Resource Constraints; Critical Path;
D O I
10.4028/www.scientific.net/AMM.455.619
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
For resource-constrained project scheduling problems, with aircraft assembly as its background, we established its mathematics model as constraint satisfaction problem. An improved critical path scheduling algorithm is proposed, considering the constraints of precedence relations, resource constraints and space constraints, through the two stages of planning, reaching for aircraft assembly task scheduling optimization objectives. Through the given numerical example results show that, when the objective consists in minimizing the project duration, the algorithm has better performance.
引用
收藏
页码:619 / +
页数:2
相关论文
共 50 条
  • [41] Interval Matching Algorithm for Task Scheduling with Time Varying Resource Constraints
    Li, Weiguan
    Li, Jialun
    Long, Yujie
    Wu, Weigang
    2022 18TH INTERNATIONAL CONFERENCE ON MOBILITY, SENSING AND NETWORKING, MSN, 2022, : 942 - 947
  • [42] A Branch and Bound Algorithm for Project Scheduling Problem with Spatial Resource Constraints
    Hu, Shicheng
    Wang, Song
    Kao, Yonggui
    Ito, Takao
    Sun, Xuedong
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2015, 2015
  • [43] An Artificial Immune Algorithm for the project scheduling problem under resource constraints
    Mobini, Mahdi
    Mobini, Zahra
    Rabbani, Masoud
    APPLIED SOFT COMPUTING, 2011, 11 (02) : 1975 - 1982
  • [44] An Improved Estimation of Distribution Algorithm for Cloud Computing Resource Scheduling
    Sun, Haisheng
    Liu, Chuang
    Xu, Rui
    Chen, Huaping
    PROCEEDINGS OF 2018 TENTH INTERNATIONAL CONFERENCE ON ADVANCED COMPUTATIONAL INTELLIGENCE (ICACI), 2018, : 484 - 489
  • [45] An improved quantum genetic algorithm for the Resource Constrained Project Scheduling
    Li Mingliang
    Song Xueyan
    PROCEEDINGS OF THE 2016 4TH INTERNATIONAL CONFERENCE ON ELECTRICAL & ELECTRONICS ENGINEERING AND COMPUTER SCIENCE (ICEEECS 2016), 2016, 50 : 612 - 617
  • [46] Pulsating Assembly Production Personnel Scheduling Technology Based on Improved Genetic Algorithm
    Chen, Shuangyue
    Zhang, Niansong
    Wang, Aimin
    PROCEEDINGS OF 2022 IEEE INTERNATIONAL CONFERENCE ON MECHATRONICS AND AUTOMATION (IEEE ICMA 2022), 2022, : 1346 - 1351
  • [47] Scheduling batch and continuous process production based on an improved differential evolution algorithm
    Wang, Hai-Yan
    Zhao, Yan-Wei
    Xu, Xin-Li
    Wang, Wan-Liang
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2009, 29 (11): : 157 - 167
  • [48] Research on Knitted Production Line Scheduling Based on Improved Simulated Annealing Algorithm
    Du, Lizhen
    Wang, Yuhao
    Xuan, Zifeng
    Ye, Tao
    Zhang, Yajun
    Computer Engineering and Applications, 2023, 59 (09): : 304 - 312
  • [49] Application research of improved genetic algorithm based on machine learning in production scheduling
    Guo, Kai
    Yang, Mei
    Zhu, Hai
    NEURAL COMPUTING & APPLICATIONS, 2020, 32 (07): : 1857 - 1868
  • [50] Application research of improved genetic algorithm based on machine learning in production scheduling
    Kai Guo
    Mei Yang
    Hai Zhu
    Neural Computing and Applications, 2020, 32 : 1857 - 1868