Subsystem Testing, Integration and Compliance of ICUBE-1

被引:0
|
作者
Mahmood, Rehan [1 ]
Khurshid, Khurram [1 ]
ul Isalm, Qamar [1 ]
机构
[1] Inst Space Technol, Dept Elect Engn, Islamabad, Pakistan
关键词
ICUBE-1; CubeSat; Computer Software; Pico-Satellite; Flight Software;
D O I
暂无
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
This paper describe the design, implementation and testing of the flight software of ICUBE-1 which is a premier CubeSat of any institution in Pakistan. ICUBE-1 is scheduled to launch in 2nd quarter of 2013. The ICUBE-1 fight software is developed to fulfill the main mission requirements, most important of which is to successfully establish the communication link with ICUBE-1 after launch and to receive the ICUBE-1 health data. This paper also describes the software architecture and design techniques used in the development of the flight software of ICUBE-1. Because of the usage of different Commercial off the Shelf (COTS) components in ICIBE-1, the software design & development team has not much liberty to use different software engineering principals. However, the ICUBE-1 has introduced the redundancy by design and other techniques to ensure the reliability of the software in-orbit. The paper also discusses the testing of the flight software while assuring the functioning as per the requirements.
引用
收藏
页码:881 / 886
页数:6
相关论文
共 50 条
  • [41] Integration of computer subsystems and power subsystem for micro-satellite
    Hong, Z.-C. (zchong@ms28.hinet.net), 1600, The Aeronautical and Astronautical Society of the Republic of China (44):
  • [42] ACCELERATED TESTING TO DETERMINE COMPLIANCE
    FRANCIS, K
    CONCRETE, 1976, 10 (12): : 16 - 18
  • [43] Compliance testing bridge to creativity
    Fussell, E
    INTECH, 2001, 48 (07) : 63 - 64
  • [44] Compliance Testing for Face Brick
    不详
    ARCHITECT, 2022, 111 (08): : 70 - 73
  • [45] Testing trends in environmental compliance
    Alan M. Polansky
    Catherine E. Check
    Journal of Agricultural, Biological, and Environmental Statistics, 2002, 7 : 452 - 468
  • [46] Tracking transmitter compliance testing
    Le Cheminant, G
    MICROWAVES & RF, 2005, 44 (09) : 70 - +
  • [47] An Implicit Integration Method for Joint Coordinate Subsystem Synthesis Method
    Jo, Junyoun
    Kim, Myoung Ho
    Kim, Sung-Soo
    TRANSACTIONS OF THE KOREAN SOCIETY OF MECHANICAL ENGINEERS A, 2012, 36 (04) : 437 - 442
  • [48] Impact of RFIC integration of system and subsystem blocks on MCM solutions
    Reedy, Ronald E.
    Comparini, Massimo Claudio
    GAAS 2005: 13th European Gallium Arsenide and Other Compound Semiconductors Application Symposium, Conference Proceedings, 2005, : 181 - 184
  • [49] Compliance and Testing Preorders Differ
    Bernardi, Giovanni
    Hennessy, Matthew
    SOFTWARE ENGINEERING AND FORMAL METHODS, 2014, 8368 : 69 - 81
  • [50] Testing compliance for IEEE 1159.3
    Evans, R.
    2005/2006 IEEE/PES TRANSMISSION & DISTRIBUTION CONFERENCE & EXPOSITION, VOLS 1-3, 2006, : 368 - 369