共 50 条
- [21] Application study of project cost risk analysis for urban light railway project [J]. PROCEEDINGS OF THE 14TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A AND B: BUILDING CORE COMPETENCIES THROUGH IE&EM, 2007, : 1358 - 1363
- [22] Cost analysis and risk supervision of project in electric power construction [J]. PROCEEDINGS OF THE 2016 4TH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE, EDUCATION TECHNOLOGY, ARTS, SOCIAL SCIENCE AND ECONOMICS (MSETASSE-16), 2016, 85 : 1544 - 1547
- [23] Analysis and Evaluation of Project Cost Risk Based on BP Algorithm [J]. ENGINEERING AND RISK MANAGEMENT, 2011, 1 : 264 - 270
- [26] Construction Project Cost Control Based on Bayesian Network [J]. CONFERENCE PROCEEDINGS OF THE 6TH INTERNATIONAL SYMPOSIUM ON PROJECT MANAGEMENT (ISPM2018), 2018, : 32 - 36
- [27] Risk Evaluation Process Modeling in Software Project Investment Based on Bayesian networks [J]. 2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2009, : 1289 - 1293
- [29] System Dynamics-based Project Cost Risk Accession Control Modeling [J]. 2018 EIGHTH INTERNATIONAL CONFERENCE ON INSTRUMENTATION AND MEASUREMENT, COMPUTER, COMMUNICATION AND CONTROL (IMCCC 2018), 2018, : 81 - 86
- [30] Research on Impact by Building Information Modeling to Transaction Cost Approach for Project Management [J]. PROCEEDINGS OF THE 11TH INTERNATIONAL CONFERENCE ON INNOVATION AND MANAGEMENT, VOLS I AND II, 2014, : 290 - 300