Study on Financial Risk Pre-warning of Combined Heat and Power Corporate

被引:0
|
作者
Xiao Zhen-hong [1 ]
机构
[1] Harbin Engn Univ, Sch Econ Management, Harbin, Peoples R China
关键词
CHP (Combined Heat and Power) corporate; Set Pair Analysis Theory; Financial crisis; Index system;
D O I
暂无
中图分类号
TN [电子技术、通信技术];
学科分类号
0809 ;
摘要
CHP(Combined Heat and Power)corporates not only can economize energy source, but also can integrate the benefits of increasing the quality of heating supply. So CHP developed rapidly after reformation in China, especially after promulgating the Law of the People's Republic of China on Conserving Energy. However analysis and pre-warning about the financial risks of CUP is not found in present literature. This paper first established an financial risk index system after analyzing the characteristics, of CHP corporates financial risks. Then this paper gave an financial risk pre-warning model which was established based on Set Pair Analysis (SPA) theory. At last, the paper gave an empirical study in order to verify the financial risk pre-warning model's feasibility in CHIP corporates.
引用
收藏
页码:10572 / 10575
页数:4
相关论文
共 50 条
  • [21] Risk pre-warning of tender evaluation for civil projects:an outlier detection model
    Cheng Tiexin1 Qi Xin1 Guo Tao2(1 College of Management
    Journal of Southeast University(English Edition), 2008, (S1) : 155 - 159
  • [22] Preliminary study on tourism crisis pre-warning information management system
    Xu, Jianzhong
    Wang, Lijing
    ISCRAM CHINA 2007: PROCEEDINGS OF THE SECOND INTERNATIONAL WORKSHOP ON INFORMATION SYSTEMS FOR CRISIS RESPONSE AND MANAGEMENT, 2007, : 24 - 29
  • [23] Discussion of enhancing accuracy for power grid dynamic security pre-warning system
    Xie, Da-Wei
    Liu, Yu-Juan
    Li, Bi-Jun
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2010, 38 (23): : 234 - 237
  • [24] THE DM BASED DSS FOR RISK PRE-WARNING IN TENDER EVALUATION OF CIVIL PROJECTS
    Cheng Tiexin
    Qi Xin
    Jiang Wenting
    PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 487 - 492
  • [25] Research on the High-Tech Project Risk Pre-warning Index Optimization
    Li, Xiaoyu
    Zhang, Mingyu
    2009 5TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-8, 2009, : 4816 - +
  • [26] Pre-warning system of maritime traffic safety risk in restricted visibility weather
    Dai, Hou-Xing
    Wu, Zhao-Lin
    Jiaotong Yunshu Gongcheng Xuebao/Journal of Traffic and Transportation Engineering, 2018, 18 (05): : 195 - 206
  • [27] Studies on Risk Pre-warning and Emergency Treatment of Thermal Coal Supply Chain
    Lu, Jing
    Chen, Jie
    Qi, Shilong
    ADVANCED TRANSPORTATION, PTS 1 AND 2, 2011, 97-98 : 648 - 652
  • [28] Risk pre-warning of tender evaluation for civil projects:an outlier detection model
    Cheng Tiexin Qi Xin Guo Tao College of Management Tianjin Polytechnic University Tianjin China College of Industrial and Commercial Administration Tianjin Polytechnic University Tianjin China
    Journal of Southeast University(English Edition), 2008, (English Edition) : 155 - 159
  • [29] Financial pre-warning research of listed tourism companies based on fuzzy comprehensive evaluation model
    Su, Weiling
    Cui, Lei
    Zha, Shanshan
    ICIC Express Letters, Part B: Applications, 2015, 6 (01): : 187 - 191
  • [30] Study of Pre-warning of City Public Crisis and Management Control in China
    Liu, Jingjian
    Chen, Wei
    Zhao, Fuyang
    Yu, Xiaoguang
    Liu, Dong
    3RD INTERNATIONAL CONFERENCE ON INFORMATION SYSTEMS FOR CRISIS RESPONSE AND MANAGEMENT & 4TH INTERNATIONAL SYMPOSIUM ON GEO-INFORMATION FOR DISASTER MANAGEMENT, 2008, : 22 - 27