共 50 条
- [41] Application of an ERM Framework and Its Real-Time System to Disaster Risk Management 2011 NINTH IEEE INTERNATIONAL SYMPOSIUM ON PARALLEL AND DISTRIBUTED PROCESSING WITH APPLICATIONS WORKSHOPS (ISPAW), 2011, : 289 - 292
- [43] Preparation and application of high-rise building for pumping lightweight aggregate concrete ULTRA-HIGH-PUMPABILITY AND HIGH PERFORMANCE CONCRETE TECHNOLOGY, 2009, 405-406 : 117 - +
- [44] Application of the suction method to reduce the wind load on high-rise building Gongcheng Lixue/Engineering Mechanics, 2009, 26 (SUPPL. 1): : 51 - 56
- [45] EARTHQUAKE DISASTER PREPAREDNESS AND LIFE OF HOMESTAY SYSTEM EVACUEES IN HIGH-RISE CONDOMINIUMS IMPLEMENTING INNOVATIVE IDEAS IN STRUCTURAL ENGINEERING AND PROJECT MANAGEMENT, 2015, : 845 - 850
- [46] Applying Real-Time Travel Times to Estimate Fire Service Coverage Rate for High-Rise Buildings APPLIED SCIENCES-BASEL, 2020, 10 (19):
- [49] TEST RESULTS - DUCTED STAIRWELL PRESSURIZATION SYSTEM IN A HIGH-RISE BUILDING ASHRAE JOURNAL-AMERICAN SOCIETY OF HEATING REFRIGERATING AND AIR-CONDITIONING ENGINEERS, 1976, 18 (02): : 34 - 40