共 50 条
- [31] Seepage Through a Homogeneous Earth-Fill Dam with a Cut-Off Wall on a Permeable Foundation Power Technology and Engineering, 2020, 54 (02): : 147 - 153
- [32] An elasto-plastic analysis for Pubugou high rockfill-earth dam with deep concrete CUT-OFF wall COMPUTATIONAL PLASTICITY: FUNDAMENTALS AND APPLICATIONS, PTS 1 AND 2, 1997, : 1679 - 1684
- [33] Study on Anti-seepage Effect of Xiongjiagang Earth-Rock Dam Based on Cut-off Wall Schemes 2010 INTERNATIONAL SYMPOSIUM ON MULTI-FIELD COUPLING THEORY OF ROCK AND SOIL MEDIA AND ITS APPLICATIONS, 2010, : 548 - 552
- [34] Stress calculation and analysis of cut-off wall in the sand gravel foundation GREEN BUILDING, ENVIRONMENT, ENERGY AND CIVIL ENGINEERING, 2017, : 151 - 154
- [38] Numerical Modeling on Fluid-Solid Coupled Erosion in Sandy Gravel Soils Containing a Suspended Cut-Off Wall Soil Mechanics and Foundation Engineering, 2024, 60 : 595 - 602
- [39] Construction of the deep cut-off at the Walter F George dam GEO-SUPPORT 2004: DRILLED SHAFTS, MICROPILING, DEEP MIXING, REMEDIAL METHODS, AND SPECIALTY FOUNDATION SYSTEMS, 2004, (124): : 530 - 544