Damage analysis of the cut-off wall in a landslide dam based on centrifuge and numerical modeling

被引:27
|
作者
Sun, Wei [1 ]
Zhang, Ga [2 ]
Zhang, Zongliang [3 ]
机构
[1] Sun Yat Sen Univ, Guangdong Res Ctr Underground Space Exploitat Tec, Sch Civil Engn, Guangdong Key Lab Ocean Civil Engn,Southern Marin, Guangzhou, Peoples R China
[2] Tsinghua Univ, State Key Lab Hydrosci & Engn, Beijing 100084, Peoples R China
[3] PowerChina Kunming Engn Co Ltd, Kunming, Yunnan, Peoples R China
基金
国家重点研发计划;
关键词
Cut-off wall; Damage analysis; Landslide dam; FEM-PD coupling method; BEHAVIOR; DISPLACEMENT; PROPAGATION; STRESS;
D O I
10.1016/j.compgeo.2020.103936
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
A concrete cut-off wall has been recently used in a landslide dam as an anti-seepage measure. Due to it is under a complex loading condition, the wall may undergo inelastic straining and have a potential of cracking. Several centrifuge model tests and numerical simulation are conducted to investigate the damage behavior of the cut-off wall. The numerical method of concurrently modelling small cracks in the cut-off wall and the overall landslide dam based on the finite element method (FEM)-Peridynamics (PD) multiscale coupling method is confirmed to be effective by the centrifuge model tests. The cut-off wall buried in a landslide dam bears a bending effect under lateral loadings in the absence of overlying fill. The lower part of the wall may have a potential to form cracks induced by large bending moments. The wall is in a tension-shear failure mode with an inclined crack. A parametric study demonstrates that properties of the wall and the soil have a significant effect on the damage behavior of the wall. Also, creep deformation of the dam body does not elongate the crack significantly, but it expands the width of the crack. The crack tends to stabilize over a period of time.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] The Stress and Displacement Analysis of the Cut-Off Wall for the Deep Overburden Dam
    Zhang, Bo
    BIOTECHNOLOGY, CHEMICAL AND MATERIALS ENGINEERING, PTS 1-3, 2012, 393-395 : 463 - 466
  • [2] ON DESIGN OF A RECTANGULAR DAM WITH A CENTRAL CUT-OFF WALL
    KING, GJW
    COLLINS, P
    GEOTECHNIQUE, 1968, 18 (04): : 489 - &
  • [3] Dam cut-off wall nears closing stages
    不详
    GROUND ENGINEERING, 1997, 30 (05): : 12 - 12
  • [4] Refined numerical simulation of a concrete cut-off wall in the thick overburden of dam foundation
    Yu, Xiang
    Wang, Yuke
    Tulamaiti, Yunusijiang
    Zhou, Chenguang
    Zhou, Yang
    Wang, Gan
    STRUCTURES, 2021, 33 : 4407 - 4420
  • [5] Study on Mechanical Characteristics of Discontinuous Cut-Off Wall of Dam Foundation Based on Plastic Damage Calculation Method
    Fang, Dinghan
    Wang, Kaituo
    Xu, Shuochang
    Wang, Xingchen
    BUILDINGS, 2024, 14 (12)
  • [6] Cut-off wall in foundation of reservoir dam and tailing dam: comparative evaluation
    Sainov, M. P.
    Talalaev, N. S.
    MAGAZINE OF CIVIL ENGINEERING, 2024, 17 (06):
  • [7] The Applications Of Concrete Cut-Off Wall In The Reinforcement Of The Earth Dam
    Li, Jinglong
    Li, Shucai
    Li, Shuchen
    ADVANCES IN COMPOSITES, PTS 1 AND 2, 2011, 150-151 : 749 - 752
  • [8] Numerical stress-deformation analysis of cut-off wall in clay-core rockfill dam on thick overburden
    Liu, Si-hong
    Wang, Liu-jiang
    Wang, Zi-jian
    Bauer, Erich
    WATER SCIENCE AND ENGINEERING, 2016, 9 (03) : 219 - 226
  • [9] Numerical stress-deformation analysis of cut-off wall in clay-core rockfill dam on thick overburden
    Si-hong Liu
    Liu-jiang Wang
    Zi-jian Wang
    Erich Bauer
    Water Science and Engineering, 2016, 9 (03) : 219 - 226
  • [10] Construction experience of concrete cut-off wall in Xiaolangdi dam project
    Li, Ligang
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 1999, 21 (05): : 625 - 627