Paper 4: Ore Reserve/Resource estimation methodologies at Elura mine

被引:0
|
作者
Leevers, P
机构
关键词
D O I
暂无
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
The Elura Reserve/Resource Estimation has traditionally been done using an inverse distance squared algorithm with a drill spacing of 20mE x 20mN x 40mRL used to define measured resources. Wireframes are constructed for each ore type, which is defined on the basis of metallurgical characteristics and density. Each individual ore type is reported separately in the reserve. Mining in the Northern Pods commenced in August 1997 and milled grades for this mineralisation were quite different from those estimated from the Resource Model. This has meant a rethink of drill spacing and estimation techniques used at Elura.
引用
收藏
页码:45 / 54
页数:10
相关论文
共 50 条
  • [31] Geostatistical reserve estimation in Dorreh barite mine
    Madani, H
    Mohammadi, AM
    26TH PROCEEDINGS OF THE APPLICATIONS OF COMPUTERS AND OPERATIONS RESEARCH IN THE MINERAL INDUSTRY, 1996, : 93 - 99
  • [32] Geological controls in resource/reserve estimation
    Sinclair, AJ
    EXPLORATION AND MINING GEOLOGY, 1998, 7 (1-2): : 29 - 44
  • [33] Ore reserve, grade control and mine/mill reconciliation practices at McArthur River mine, NT
    Pevely, S
    ORE RESERVE RECONCILIATION WORKSHOP, 1997, (09): : 61 - 80
  • [34] ORE-RESERVE CALCULATION OF STOPES AT MOGUL MINE, SILVERMINES, IRELAND
    FILION, M
    CIM BULLETIN, 1976, 69 (766): : 73 - 79
  • [35] A geologically correct ore reserve: The Redeemer gold mine, Agnew, WA
    Pedersen, AJ
    Broome, JM
    GOLD & NICKEL ORE RESERVE ESTIMATION PRACTICE SEMINAR - SEMINAR PAPERS: TOWARDS 2000, 1998, (10): : 70 - 75
  • [36] Mineral resource estimation of the Brockman 4 iron ore deposit in the Pilbara region
    Sommerville, B.
    Boyle, C.
    Brajkovich, N.
    Savory, P.
    Latscha, A.
    TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION B-APPLIED EARTH SCIENCE, 2014, 123 (02): : 135 - 145
  • [37] APPLICATIONS OF GEOSTATISTICS IN ORE RESERVE ESTIMATION AND GRADE CONTROL
    CARLIER, PA
    BLAIS, RA
    CANADIAN MINING AND METALLURGICAL BULLETIN, 1967, 60 (664): : 883 - &
  • [38] APPLICATION OF GEOSTATISTICAL CRITERIA TO URANIUM ORE RESERVE ESTIMATION
    LUCERO, HN
    CANADIAN MINING AND METALLURGICAL BULLETIN, 1970, 63 (696): : 447 - &
  • [39] ORE RESERVE ESTIMATION AND GRADE CONTROL AT BETHLEHEM COPPER
    EWANCHUC.HG
    CANADIAN MINING AND METALLURGICAL BULLETIN, 1967, 60 (664): : 885 - &
  • [40] ORE RESERVE ESTIMATION AND GRADE CONTROL AT KNOB LAKE
    DAGENAIS, JE
    DUNN, WJ
    HAMILTON, CG
    TAYLOR, R
    SELLECK, DJ
    CANADIAN MINING AND METALLURGICAL BULLETIN, 1967, 60 (664): : 885 - &