Contextual Information Requirements of Cost Estimators from Past Construction Projects

被引:16
|
作者
Kiziltas, Semiha [2 ]
Akinci, Burcu [1 ]
机构
[1] Carnegie Mellon Univ, Dept Civil & Environm Engn, Pittsburgh, PA 15213 USA
[2] Middle E Tech Univ, Dept Civil Engn, TR-06531 Ankara, Turkey
关键词
PRODUCTIVITY;
D O I
10.1061/(ASCE)CO.1943-7862.0000053
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Past project data sources provide key information for construction cost estimators. Previous research studies show that relying only on one's own experience during estimation results in estimators' bias. Having and referring to historical databases, containing objective information on what happened in past projects, are essential for reducing estimators' biases. The first step toward development of useful project history databases is to understand what information estimators require from past projects. The research described in this paper targets estimators' information needs identified through interviews, brainstorming sessions, task analyses, and card games conducted with estimators with different experience levels and specialized in heavy/civil and commercial construction projects, and exploration of historical and standard databases available in companies to determine what is being currently represented. Findings show that estimators need contextual information, depicting the conditions under which specific production rates were achieved, so that they can identify which production rate would be more realistic to use during the production rate estimation of an activity in a new bid. Comparison of the contextual information needs identified in this research with information items available in historical data sources (such as company cost reports, RSMeans, previous studies) highlighted some gaps and important opportunities for improvements in those sources. The identified contextual information items are significant for practitioners in developing ways to augment their existing project history databases to make them more beneficial for estimators.
引用
收藏
页码:841 / 852
页数:12
相关论文
共 50 条
  • [41] Practical cost management system for construction projects
    Tenah, KA
    SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 377 - 382
  • [42] Forecasting final cost and budget of construction projects
    Teicholz, Paul
    Journal of Computing in Civil Engineering, 1993, 7 (04) : 511 - 529
  • [43] Causes of Construction Projects Cost Overrun in Brazil
    Franca, Alda
    Haddad, Assed
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2018, 9 (01): : 69 - 83
  • [44] Preliminary Cost Estimating for Road Construction Projects
    Mahamid, Ibrahim
    Bruland, Amund
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3, 2010, : 158 - 161
  • [45] A brief on cost controls of highway construction projects
    Liu, Y.
    Gong, G.
    Zhan, X.
    SUSTAINABLE BUILDINGS AND STRUCTURES: BUILDING A SUSTAINABLE TOMORROW, 2020, : 17 - 17
  • [46] Framework for target cost modelling in construction projects
    Alwisy, Aladdin
    Bouferguene, Ahmed
    Al-Hussein, Mohamed
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (02) : 89 - 104
  • [47] Cost structure of construction work on building projects
    Martinec, Neven
    Ajdukovic, Nevena Hrnjak
    Bezak, Stjepan
    GRADEVINAR, 2010, 62 (04): : 307 - 311
  • [48] Reliability past-evaluation to expressway construction projects
    School of Civil Engineering, Chang'an University, Xi'an 710061, China
    不详
    Chang'an Daxue Xuebao, 2006, 6 (69-72):
  • [50] Cost and time control of construction projects in the UK
    Yakubu, Olawale
    Sun, Ming
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 278 - 286