Economic evaluation of disassembly processes in remanufacturing systems

被引:29
|
作者
Tang, O [1 ]
Grubbström, RW
Zanoni, S
机构
[1] Linkoping Inst Technol, Dept Prod Econ, SE-58183 Linkoping, Sweden
[2] Univ Brescia, Dipartimento Ingn Meccan, I-25060 Brescia, Italy
关键词
D O I
10.1080/00207540410001699435
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A model to deal with the disassembly processes in remanufacturing systems is presented with focus being on evaluating their economic consequences. More specifically, the model assists decisions such as to which degree and for the sake of which components should the returned items be disassembled. Consequently, using the economic values of recoverable items, the inventory holding costs of these items are obtained. This information is further used to determine the inventory control policy. To access such economic values, the above average cost approach is compared with the net present value method. The latter is often considered a more 'correct' way in remanufacturing systems from the viewpoint of inventory control. The results from the economic evaluation model are intended to aid companies in systematically evaluating current as well as projected remanufacturing systems.
引用
收藏
页码:3603 / 3617
页数:15
相关论文
共 50 条
  • [21] Flat screen monitor disassembly and testing for remanufacturing
    Kernbaum, Sebastian
    Franke, Carsten
    Seliger, Günther
    International Journal of Sustainable Manufacturing, 2009, 1 (03) : 347 - 360
  • [22] Service Platform for Robotic Disassembly Planning in Remanufacturing
    Liu, Jiayi
    Zhou, Zude
    Pham, Duc Truong
    Xu, Wenjun
    Cui, Jia
    Yang, Can
    Journal of Manufacturing Systems, 2020, 57 : 338 - 356
  • [23] Service Platform for Robotic Disassembly Planning in Remanufacturing
    Liu, Jiayi
    Zhou, Zude
    Duc Truong Pham
    Xu, Wenjun
    Cui, Jia
    Yang, Can
    JOURNAL OF MANUFACTURING SYSTEMS, 2020, 57 : 338 - 356
  • [24] Application of Design for Disassembly from Remanufacturing Perspective
    Soh, S. L.
    Ong, S. K.
    Nee, A. Y. C.
    12TH GLOBAL CONFERENCE ON SUSTAINABLE MANUFACTURING - EMERGING POTENTIALS, 2015, 26 : 577 - 582
  • [25] Adaptive Multi-Priority Rule Approach To Control Agile Disassembly Systems In Remanufacturing
    Wurster, Marco
    Bail, Finn
    Behrendt, Sebastian
    Lanza, Gisela
    PROCEEDINGS OF THE CONFERENCE ON PRODUCTION SYSTEMS AND LOGISTICS, CPSL 2023-2, 2023, : 782 - 792
  • [26] SYSTEMS-APPROACH TO EVALUATION OF ECONOMIC PROCESSES IN AUTOMATIC SYSTEMS OF CONTROL
    ZARUBA, P
    EKONOMICKO-MATEMATICKY OBZOR, 1975, 11 (03): : 247 - 251
  • [27] Remanufacturing disassembly service line and balancing optimization method
    Xia X.
    Zhou M.
    Wang L.
    Cao J.
    Wang, Lei (wanglei1987@wust.edu.cn), 2018, CIMS (24): : 2492 - 2501
  • [28] Master disassembly scheduling in a remanufacturing system with stochastic routings
    Muris Lage Junior
    Moacir Godinho Filho
    Central European Journal of Operations Research, 2017, 25 : 123 - 138
  • [29] Selective Parallel Disassembly Sequence Planning Method for Remanufacturing
    Tian Y.
    Zhang X.
    Xu J.
    Li Z.
    Jisuanji Fuzhu Sheji Yu Tuxingxue Xuebao/Journal of Computer-Aided Design and Computer Graphics, 2018, 30 (03): : 531 - 539
  • [30] Dynamic disassembly planning for remanufacturing of multiple types of products
    Kang, C. M.
    Hong, Y. S.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (22) : 6236 - 6248