Risk Assessment of Water Treatment Plants Using Fuzzy Fault Tree Analysis and Monte Carlo Simulation

被引:16
|
作者
Tabesh, Massoud [1 ]
Roozbahani, Abbas [2 ]
Hadigol, Farhad [1 ]
Ghaemi, Elham [1 ]
机构
[1] Univ Tehran, Coll Engn, Sch Civil Engn, Tehran, Iran
[2] Univ Tehran, Dept Irrigat Engn, Aburaihan Campus, Tehran, Iran
关键词
Risk analysis; Water treatment plant; FFTA; Monte Carlo simulation;
D O I
10.1007/s40996-020-00498-3
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Urban water supply, transmission, and distribution systems are considered as the basic infrastructures of each community. Deficiency of water resources in system leads to lack of some subscribers' access to safe water at any time. The water treatment units have a high potential for massive crisis and importance of sustainable performance in water treatment plants, due to their special role in high quantity and quality water supply even in critical situations, requires a comprehensive approach in assessing and increasing the reliability. A comprehensive approach in assessing the performance of water treatment plants and reducing their vulnerability can lead to cost reduction of inappropriate performance in critical situations and also a focus on the most important vulnerable parts of water treatment plants to decrease their vulnerability, as well as cost-effective budgeting in recovery programs. In this research, due to the uncertainties in the input information, two methods of fuzzy fault tree analysis (FFTA) and fault tree analysis (FTA) based on Monte Carlo simulation were evaluated in Jalaliyeh water treatment plant in Tehran, and results of both approaches were compared in terms of uncertainty analysis. The results indicate the low to moderate failure risk in the treatment plant in both approaches and a small difference between results in both cases. Failure probability of top event for FFTA and Monte Carlo-based FTA methods is 0.194 and 0.27, respectively. In the basic event rating, it was found that threats such as inappropriate reservoir design, power equipment failure, transfer pipe failure, and inappropriate maintenance of the pumps play the major role in treatment plant failure.
引用
收藏
页码:643 / 658
页数:16
相关论文
共 50 条
  • [41] Discussion: Risk assessment of revetments by Monte Carlo simulation
    Balas, C. E.
    Balas, L.
    Williams, A. T.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MARITIME ENGINEERING, 2006, 159 (02) : 81 - 84
  • [42] Seismic risk assessment for structures with the Monte Carlo simulation
    Bolotin, V.V.
    Probabilistic Engineering Mechanics, 1993, 8 (3-4) : 169 - 177
  • [43] Risk Assessment of Plan Schedule by Monte Carlo Simulation
    Kong, Zhaoni
    Zhang, Jianping
    Li, Chao
    Zheng, Xiaoying
    Guan, Qingqing
    PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND MANAGEMENT INNOVATION, 2015, 28 : 509 - 513
  • [44] MONTE-CARLO SIMULATION IN RISK ANALYSIS
    HARALAMBIDES, HE
    FINANCIAL MANAGEMENT, 1991, 20 (02) : 15 - 16
  • [45] Modeling uncertainty in risk assessment: An integrated approach with fuzzy set theory and Monte Carlo simulation
    Arunraj, N. S.
    Mandal, Saptarshi
    Maiti, J.
    ACCIDENT ANALYSIS AND PREVENTION, 2013, 55 : 242 - 255
  • [46] Comparison of Monte Carlo simulation and fuzzy Math computation for validation of summation in quantitative risk assessment
    Im, Myung Nam
    Lee, Seung Ju
    FOOD SCIENCE AND BIOTECHNOLOGY, 2007, 16 (03) : 361 - 366
  • [47] Combination of technological and economical risk assessment using the Monte-Carlo-Simulation
    Plinke, F.
    Althaus, D.
    Braasch, A.
    Meyna, A.
    SAFETY AND RELIABILITY: METHODOLOGY AND APPLICATIONS, 2015, : 1655 - 1662
  • [48] Life-Cycle Oriented Risk Assessment Using a Monte Carlo Simulation
    Zust, Simon
    Huonder, Michael
    West, Shaun
    Stoll, Oliver
    APPLIED SCIENCES-BASEL, 2022, 12 (01):
  • [49] Risk Assessment in Bridge Construction Projects Using Fault Tree and Event Tree Analysis Methods Based on Fuzzy Logic
    Abdollahzadeh, Gholamreza
    Rastgoo, Sima
    ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART B-MECHANICAL ENGINEERING, 2015, 1 (03):
  • [50] Risk assessment of shield tunnel construction cost using fuzzy fault tree
    Zheng, Jun-Jie
    Lin, Chi-Feng
    Zhao, Dong-An
    Ding, Lie-Yun
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2011, 33 (04): : 501 - 508