Co-scheduling of Flexible Energy Loads in Building Clusters

被引:0
|
作者
Wei, Tianshu [1 ]
Zhu, Qi [1 ]
机构
[1] Univ Calif Riverside, Dept Elect & Comp Engn, Riverside, CA 92521 USA
关键词
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Buildings account for nearly 40% of energy consumption in the United States. To improve energy efficiency and reduce peak demand, intelligent building management systems can be developed to manage the energy consumption of flexible loads such as heating, ventilation, and air conditioning (HVAC) system and electric vehicle (EV) charging, as well as the usage of energy storage systems such as batteries. In the case where a building cluster is managed by the same institution, coordinating the energy consumption behavior across multiple buildings can provide further benefits in energy efficiency. In this paper, we first investigate an integrated co-scheduling scheme that uses a joint formulation to optimize the control of HVAC systems, EV charging and battery storage in multiple buildings for reducing the overall energy cost. Then, we further explore a more efficient heuristic scheme where the shared battery storage and EV charging demand are assigned to each building for separate buildinglevel scheduling. Our experiments demonstrate the effectiveness of our co-scheduling scheme and separate-scheduling heuristic in reducing energy cost for building clusters.
引用
收藏
页码:958 / 961
页数:4
相关论文
共 50 条
  • [21] Is Co-scheduling Too Expensive for SMP VMs?
    Sukwong, Orathai
    Kim, Hyong S.
    EUROSYS 11: PROCEEDINGS OF THE EUROSYS 2011 CONFERENCE, 2011, : 257 - 271
  • [22] Case Study on Co-Scheduling for HPC Applications
    Breitbart, Jens
    Weidendorfer, Josef
    Trinitis, Carsten
    2015 44TH INTERNATIONAL CONFERENCE ON PARALLEL PROCESSING WORKSHOPS, 2015, : 277 - 285
  • [23] Co-scheduling threads in SMT processors fairly
    College of Computer, National University of Defense Technology, Changsha 410073, China
    Tien Tzu Hsueh Pao/Acta Electronica Sinica, 2008, 36 (02): : 224 - 229
  • [24] Revisiting Co-Scheduling for Upcoming ExaScale Systems
    Lankes, Stefan
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON HIGH PERFORMANCE COMPUTING & SIMULATION (HPCS 2015), 2015, : 669 - 670
  • [25] Resilient application co-scheduling with processor redistribution
    Benoit, Anne
    Pottier, Loic
    Robert, Yves
    PROCEEDINGS 45TH INTERNATIONAL CONFERENCE ON PARALLEL PROCESSING - ICPP 2016, 2016, : 123 - 132
  • [26] Community Microgrid Energy Co-Scheduling Based on Deep Reinforcement Learning and Contribution Mechanisms
    Xiong, Kang
    Wei, Qinglai
    Liu, Yu
    IEEE TRANSACTIONS ON SMART GRID, 2025, 16 (02) : 1051 - 1061
  • [27] Communication Aware Co-scheduling for Parallel Sob Scheduling in Cluster Computing
    Madheswari, A. Neela
    Banu, R. S. D. Wahida
    ADVANCES IN COMPUTING AND COMMUNICATIONS, PT 2, 2011, 191 : 545 - +
  • [28] Software/hardware co-scheduling for reconfigurable computing systems
    Saha, Proshanta
    El-Ghazawi, Tarek
    FCCM 2007: 15TH ANNUAL IEEE SYMPOSIUM ON FIELD-PROGRAMMABLE CUSTOM COMPUTING MACHINES, PROCEEDINGS, 2007, : 299 - +
  • [29] Developing Co-scheduling Mechanisms for Virtual Machines in Clouds
    Jiang, Peng
    He, Ligang
    2017 14TH INTERNATIONAL SYMPOSIUM ON PERVASIVE SYSTEMS, ALGORITHMS AND NETWORKS & 2017 11TH INTERNATIONAL CONFERENCE ON FRONTIER OF COMPUTER SCIENCE AND TECHNOLOGY & 2017 THIRD INTERNATIONAL SYMPOSIUM OF CREATIVE COMPUTING (ISPAN-FCST-ISCC), 2017, : 257 - 264
  • [30] Linux kernel co-scheduling and bulk synchronous parallelism
    Jones, Terry
    INTERNATIONAL JOURNAL OF HIGH PERFORMANCE COMPUTING APPLICATIONS, 2012, 26 (02): : 136 - 145