共 50 条
- [32] The assessment of the optimal time window for prediction of seismic hazard for longwall coal mining: the case study Acta Geophysica, 2021, 69 : 691 - 699
- [33] Using hydraulic fracturing to control caving of the hanging roof during the initial mining stages in a longwall coal mine: a case study Arabian Journal of Geosciences, 2018, 11
- [39] Study of technology on roof control in longwall top-coal caving in the "two-hard" condition PROCEEDINGS IN MINING SCIENCE AND SAFETY TECHNOLOGY, 2002, : 69 - 72
- [40] Engineering application and demonstration of intelligent mining control technology for rockburst coal seam Meitan Kexue Jishu/Coal Science and Technology (Peking), 2024, 52 (09): : 112 - 124