Response time reduction in make-to-order and assemble-to-order supply chain design

被引:19
|
作者
Vidyarthi, Navneet [1 ,3 ]
Elhedhli, Samir [2 ]
Jewkes, Elizabeth [2 ]
机构
[1] Concordia Univ, John Molson Sch Business, MIS, Montreal, PQ, Canada
[2] Univ Waterloo, Dept Management Sci, Waterloo, ON N2L 3G1, Canada
[3] Concordia Univ, John Molson Sch Business, Dept Decis Sci, Montreal, PQ, Canada
关键词
Response time; make to order; assemble to order; supply chain design; cutting plane method; Lagrangean relaxation; SERVICE SYSTEM-DESIGN; NETWORK DESIGN; INTEGRATED DESIGN; SELECTION; CENTERS; MODELS;
D O I
10.1080/07408170802382741
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Make-to-order and assemble-to-order systems are successful business strategies in managing responsive supply chains, characterized by high product variety, highly variable customer demand and short product life cycles. These systems usually spell long customer response times due to congestion. Motivated by the strategic importance of response time reduction, this paper presents models for designing make-to-order and assemble-to-order supply chains under Poisson customer demand arrivals and general service time distributions. The make-to-order supply chain design model seeks to simultaneously determine the location and the capacity of distribution centers (DCs) and allocate stochastic customer demand to DCs by minimizing response time in addition to the fixed cost of opening DCs and equipping them with sufficient assembly capacity and the variable cost of serving customers. The problem is setup as a network of spatially distributed M/G/1 queues, modeled as a non-linear mixed-integer program, and linearized using a simple transformation and a piecewise linear approximation. An exact solution approach is presented that is based on the cutting plane method. Then, the problem of designing a two-echelon assemble-to-order supply chain comprising of plants and DCs serving a set of customers is considered. A Lagrangean heuristic is proposed that exploits the echelon structure of the problem and uses the solution methodology for the make-to-order problem. Computational results and managerial insights are provided. It is empirically shown that substantial reduction in response times can be achieved with minimal increase in total costs in the design of responsive supply chains. Furthermore, a supply chain configuration that considers congestion is proposed and its effect on the response time can be very different from the traditional configuration that ignores congestion.
引用
收藏
页码:448 / 466
页数:19
相关论文
共 50 条
  • [1] A HEURISTIC TO SUPPORT MAKE-TO-STOCK, ASSEMBLE-TO-ORDER, AND MAKE-TO-ORDER DECISIONS IN SEMICONDUCTOR SUPPLY CHAINS
    Forstner, Lisa
    Moench, Lars
    [J]. 2013 WINTER SIMULATION CONFERENCE (WSC), 2013, : 3696 - 3706
  • [2] DISTINGUISHING FEATURES OF JUST-IN-TIME SYSTEMS IN THE MAKE-TO-ORDER ASSEMBLE-TO-ORDER ENVIRONMENT
    HANDFIELD, R
    [J]. DECISION SCIENCES, 1993, 24 (03) : 581 - 602
  • [3] Responsive make-to-order supply chain network design
    Aboolian, Robert
    Berman, Oded
    Wang, Jiamin
    [J]. NAVAL RESEARCH LOGISTICS, 2021, 68 (02) : 241 - 258
  • [4] Simulating order fulfillment with product substitutions in an assemble-to-order supply chain
    Ervolina, Thomas R.
    Ettl, Markus
    Lee, Young M.
    Peters, Daniel J.
    [J]. PROCEEDINGS OF THE 2006 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2006, : 2012 - +
  • [5] Supply Chain Scheduling in a Make-to-Order Environment
    Wang, Lei
    Wang, Guoqing
    [J]. PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON OPERATIONS AND SUPPLY CHAIN MANAGEMENT (ICOSCM 2010), 2010, 4 : 352 - 355
  • [6] Supply Disruption and Reactive Strategies in an Assemble-to-Order Supply Chain With Time-Sensitive Demand
    Shao, Xiao-Feng
    Dong, Ming
    [J]. IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2012, 59 (02) : 201 - 212
  • [7] Annualized hours as a capacity planning tool in make-to-order or assemble-to-order environment:: an agricultural implements company case
    Gonçalves, EV
    Marçola, JA
    [J]. PRODUCTION PLANNING & CONTROL, 2001, 12 (04) : 388 - 398
  • [8] Lead-Time Management in a Make-to-Order Fashion Supply Chain
    Shi, Jing
    Xiao, Tiaojun
    Xu, Tiantian
    [J]. 2013 INTERNATIONAL CONFERENCE ON MANAGEMENT (ICM 2013), 2013, : 47 - 52
  • [9] Selecting sourcing partners for a make-to-order supply chain
    Yue, Jinfeng
    Xia, Yu
    Tran, Thuhang
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2010, 38 (3-4): : 136 - 144
  • [10] Optimizing the supply chain configuration for make-to-order manufacturing
    Li, Haitao
    Womer, Keith
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 221 (01) : 118 - 128