共 50 条
- [24] Scheduling on identical parallel machines to minimize total completion time with deadline and machine eligibility constraints INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 40 (5-6): : 572 - 581
- [25] Scheduling on identical parallel machines to minimize total completion time with deadline and machine eligibility constraints The International Journal of Advanced Manufacturing Technology, 2009, 40 : 572 - 581
- [29] A branch-and-bound algorithm for the two-machine total completion time flowshop problem subject to release dates Operational Research, 2020, 20 : 21 - 35
- [30] Scheduling orders on either dedicated or flexible machines in parallel to minimize total weighted completion time Annals of Operations Research, 2008, 159 : 107 - 123