A study of the multi-stage flowshop scheduling problem with alternative operation assignments

被引:4
|
作者
Futatsuishi, Y
Watanabe, I
Nakanishi, T
机构
[1] Seikei Univ, Musashino, Tokyo 1808633, Japan
[2] Tokushima Bunri Univ, Tokushima 7708514, Japan
关键词
makespan; flowshop; assignment; scheduling; sequencing;
D O I
10.1016/S0378-4754(01)00394-9
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In small-item large lot production, a single person had only single processing to do. A recent tendency of the production system is the multi-item small lot production. In this type of production system, one work person needs skills that are adaptable to multi-item articles. As the single work person needs more than one skill, one processing operation which comprises a job has come to be handled by several work persons. From the viewpoint of a job, one elementary operation has come to be processed by several alternative operation assignments. We discuss the problem of how to minimize the total elapsed time from the start up time to the completion of a job. In order to solve this problem, we analyze it theoretically under a simpler condition, then we propose an approximation algorithm based on the theoretical analysis applicable to a more general problem. (C) 2002 IMACS. Published by Elsevier Science B.V. All rights reserved.
引用
收藏
页码:73 / 79
页数:7
相关论文
共 50 条
  • [21] A Multi-stage and Parallel-Machine Scheduling Problem for Solar Cell Industry
    Wang, Li-chih
    Cheng, Chen-yang
    Chen, Tzu-li
    Chen, Yin-yann
    Wang, Chung-chun
    PROCEEDINGS OF 2012 3RD INTERNATIONAL ASIA CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION (IEMI2012), 2013, : 201 - 212
  • [22] Optimization of class of multi-stage coupled integrated scheduling problem with process constraints
    Su Z.
    Deng C.
    Qian B.
    Hu R.
    Chen B.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2024, 30 (03): : 1072 - 1091
  • [23] A multi-stage dynamic soft scheduling algorithm for the uncertain steelmaking-continuous casting scheduling problem
    Jiang, Sheng-long
    Zheng, Zhong
    Liu, Min
    APPLIED SOFT COMPUTING, 2017, 60 : 722 - 736
  • [24] Appointment scheduling in multi-stage outpatient clinics
    Klassen, Kenneth J.
    Yoogalingam, Reena
    HEALTH CARE MANAGEMENT SCIENCE, 2019, 22 (02) : 229 - 244
  • [25] Reachability and Deadlocking Problems in Multi-stage Scheduling
    Eggermont, Christian E. J.
    Woeginger, Gerhard J.
    REACHABILITY PROBLEMS, 2011, 6945 : 153 - 164
  • [26] Batching and scheduling in a multi-stage kanban system
    Sarker, BR
    Balan, CV
    6TH INDUSTRIAL ENGINEERING RESEARCH CONFERENCE PROCEEDINGS: (IERC), 1997, : 674 - 679
  • [27] Financial optimisation of the scheduling for the multi-stage project
    Klimek, M.
    Lebkowski, P.
    BULLETIN OF THE POLISH ACADEMY OF SCIENCES-TECHNICAL SCIENCES, 2017, 65 (06) : 899 - 908
  • [28] Appointment scheduling in multi-stage outpatient clinics
    Kenneth J. Klassen
    Reena Yoogalingam
    Health Care Management Science, 2019, 22 : 229 - 244
  • [29] Multi-stage appointment scheduling for outpatient chemotherapy unit: a case study
    Bouras, Asma
    Masmoudi, Malek
    Saadani, Nour El Houda
    Bahroun, Zied
    Abdeljaouad, Mohamed Amine
    RAIRO-OPERATIONS RESEARCH, 2021, 55 (02) : 589 - 610
  • [30] On the Multi-Stage Influence Maximization Problem
    Rahaman, Inzamam
    Hosein, Patrick
    2016 IEEE LATIN AMERICAN CONFERENCE ON COMPUTATIONAL INTELLIGENCE (LA-CCI), 2016,