TESTING IN PARALLEL A Need for Practical Regression Testing

被引:0
|
作者
Zhang, Zhenyu [1 ]
Tong, Zijian [2 ]
Gao, Xiaopeng [3 ]
机构
[1] Chinese Acad Sci, Inst Software, State Key Lab Comp Sci, Beijing, Peoples R China
[2] Sohucom Inc, R&D, Beijing, Peoples R China
[3] Beihang Univ, Sch Comp Sci & Technol, Beijing, Peoples R China
来源
ICSOFT 2010: PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON SOFTWARE AND DATA TECHNOLOGIES, VOL 2 | 2010年
基金
国家高技术研究发展计划(863计划);
关键词
Regression Testing; Test Case Prioritization; Continuous Integration; Pipeline Scheduling;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
When software evolves, its functionalities are evaluated using regression testing. In a regression testing process, a test suite is augmented, reduced, prioritized, and run on a software build version. Regression testing has been used in industry for decades; while in some modern software activities, we find that regression testing is yet not practical to apply. For example, according to our realistic experiences in Sohu.com Inc., running a reduced test suite, even concurrently, may cost two hours or longer. Nevertheless, in an urgent task or a continuous integration environment, the version builds and regression testing requests may come more often. In such a case, it is not strange that a new round of test suite run needs to start before all the previous ones have terminated. As a solution, running test suites on different build versions in parallel may increase the efficiency of regression testing and facilitate evaluating the fitness of software evolutions. On the other hand, hardware and software resources limit the number of paralleled tasks. In this paper, we raise the problem of testing in parallel, give the general problem settings, and use a pipeline presentation for data visualization. Solving this problem is expected to make practical regression testing.
引用
收藏
页码:344 / 348
页数:5
相关论文
共 50 条