Measurement and analysis on the thickness of power tunnels' loosened zone for Bakun Hydropower Station

被引:0
|
作者
Zhou, Liming [1 ]
Xiao, Guoqiang [1 ]
Yin, Jianmin [1 ]
Wang, Fagang [1 ]
机构
[1] Changjiang River Sci Res Inst, Wuhan, Peoples R China
关键词
Bakun Hydropower Station; loosened zone; dynamic deformation modulus;
D O I
暂无
中图分类号
P3 [地球物理学]; P59 [地球化学];
学科分类号
0708 ; 070902 ;
摘要
In order to estimate the excavating quality, confirm the shoring scheme, analyze the rock stability, the sonic wave test method is used on the loosened zone. The thickness of loosened zone and the value of dynamic deformation modulus are provided. The rule of loosened zone is analyzed. The blasting impact on loosened zone is strong. The result that the rock mechanics characteristics are obviously weakened is controlled by the type of rock mass.
引用
收藏
页码:196 / 199
页数:4
相关论文
共 27 条
  • [1] Results of field measurement of a loosened zone at the intersection of tunnels in jointed rock mass
    Ishizuka, Yoshio
    Saito, Akira
    Izumiya, Yasushi
    Doboku Gakkai Rombun-Hokokushu/Proceedings of the Japan Society of Civil Engineers, 1993, (475 pt 3-24): : 129 - 136
  • [2] Stability Analysis on the Surrounding Rock Mass around Power Diversion Tunnels in Jinping Hydropower Station
    Zhang Bo-Hu
    Chen Wan-Lin
    2010 CONFERENCE ON MODERN HYDRAULIC ENGINEERING, 2010, : 322 - 324
  • [3] Simulation analysis of stability of spillway tunnels of Jiangping River Hydropower Station
    Wu Jia-guan
    Duan Ya-hui
    ROCK AND SOIL MECHANICS, 2009, 30 (08) : 2431 - +
  • [4] Stability analysis of diversion tunnels in Jinping II hydropower station project
    Zhang, Chuanqing
    Feng, Xiating
    Zhou, Hui
    Huang, Shuling
    Jiang, Quan
    PHYSICAL AND NUMERICAL SIMULATION OF MATERIALS PROCESSING, PTS 1 AND 2, 2008, 575-578 : 1287 - 1292
  • [5] Stability Analysis of Jinchuan Hydropower Station Hydraulic Tunnels during Excavation and Unloading
    Zhang, Yan
    Mao, Haoyu
    Li, Biao
    Sun, Yuepeng
    APPLIED SCIENCES-BASEL, 2022, 12 (22):
  • [6] Coupled Hydrologic-Mechanical-Damage Analysis and Its Application to Diversion Tunnels of Hydropower Station
    Jiang, Annan
    Yang, Xiurong
    Xu, Mengfei
    Jiang, Tengfei
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [7] Regression analysis of initial geostress field in dam zone of Dagangshan hydropower station
    Zhang Jian-guo
    Zhang Qiang-yong
    Yang Wen-dong
    Zhang Xin
    ROCK AND SOIL MECHANICS, 2009, 30 (10) : 3071 - 3078
  • [8] Regression analysis of initial geostress field in dam zone of Dagangshan hydropower station
    Research Center of Geotechnical and Structural Engineering, Shandong University, Jinan 250061, China
    不详
    Rock Soil Mech, 2009, 10 (3071-3078):
  • [9] Risks Analysis of Discarding Water in Power Generation Process of Hydropower Station
    Liu, Guangbiao
    Zhou, Jianzhong
    Yang, Yuqi
    Ke, Shenglin
    Mo, Li
    Wang, Yongqiang
    Xiao, Xiaogang
    IEEE ACCESS, 2020, 8 (08): : 132703 - 132720
  • [10] Back analysis of initial geostress field for underground powerhouse zone of Shuangjiangkou hydropower station
    Geotechnical and Structural Engineering Research Center, Shandong University, Jinan
    250061, China
    不详
    257400, China
    不详
    250013, China
    Tumu Gongcheng Xuebao, 8 (86-95): : 86 - 95