Solving the resource-constrained multi-project scheduling problem with an improved critical chain method

被引:11
|
作者
Tian, Min [1 ]
Liu, Ren Jing [1 ]
Zhang, Guang Jun [1 ]
机构
[1] Xi An Jiao Tong Univ, Sch Management, Xian 710049, Shaanxi, Peoples R China
基金
中国国家社会科学基金;
关键词
CCM; buffer settings; RCMPSP; hierarchical strategy; MANAGEMENT;
D O I
10.1080/01605682.2019.1609883
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In view of the fact that the critical chain method (CCM) is mainly used in single project scheduling, this article improves the method and applies it to multi-project scheduling. Taking into consideration the flow of the drum resource within and among sub-projects, this study proposes methods that can be used to identify the critical chain and buffer settings, based on the concepts of the task chain, sub-project drum resource flow, and multi-project drum resource flow. The improvement of the CCM includes two aspects. First, by analysing the impact of the drum buffer and capacity constrained buffer on the project buffer and feeding buffer, the calculation methods of these buffers are optimised. Second, a risk contribution index is designed for the modification of these buffers, in order to further improve their anti-interference ability. Then, combined with the improved CCM and the different hierarchical scheduling objectives, a critical chain resource-constrained multi-project scheduling model with a hierarchical strategy is proposed as a way of solving multi-project scheduling plans. Eight theoretical test cases with different scales, and a practical example under different risk levels of uncertainty are used to test this model. The results show that the stability of the scheduling plans clearly improved, and the project duration and tardiness costs were significantly reduced, thus proving the effectiveness of the model.
引用
收藏
页码:1243 / 1258
页数:16
相关论文
共 50 条
  • [41] A genetic algorithm for the resource constrained multi-project scheduling problem
    Goncalves, J. F.
    Mendes, J. J. M.
    Resende, M. G. C.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) : 1171 - 1190
  • [42] HEURISTIC FRAMEWORK FOR THE RESOURCE CONSTRAINED MULTI-PROJECT SCHEDULING PROBLEM
    KIM, SO
    SCHNIEDERJANS, MJ
    COMPUTERS & OPERATIONS RESEARCH, 1989, 16 (06) : 541 - 556
  • [43] A faster exact method for solving the robust multi-mode resource-constrained project scheduling problem
    Bold, Matthew
    Goerigk, Marc
    OPERATIONS RESEARCH LETTERS, 2022, 50 (05) : 581 - 587
  • [44] Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms
    Alcaraz, J
    Maroto, C
    Ruiz, R
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2003, 54 (06) : 614 - 626
  • [45] Improved Compact Models for the Resource-Constrained Project Scheduling Problem
    Tesch, Alexander
    OPERATIONS RESEARCH PROCEEDINGS 2016, 2018, : 25 - 30
  • [46] Improved ACO Algorithm for Resource-Constrained Project Scheduling Problem
    Zhou, Yumiao
    Guo, Qingshun
    Gan, Rongwei
    2009 INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND COMPUTATIONAL INTELLIGENCE, VOL III, PROCEEDINGS, 2009, : 358 - 365
  • [47] An improved PSO algorithm for resource-constrained project scheduling problem
    Luo, Xinggang
    Wang, Dingwei
    Tang, Jianfu
    Tu, Yiliu
    WCICA 2006: SIXTH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-12, CONFERENCE PROCEEDINGS, 2006, : 3514 - +
  • [48] Solving resource-constrained multi-project environment under different activity assumptions
    Ben Issa S.
    Patterson R.A.
    Tu Y.
    International Journal of Production Economics, 2021, 232
  • [49] Multimode Resource-Constrained Multi-Project Scheduling with Ad Hoc Activity Splitting
    Joo, B. J.
    Chua, P. C.
    2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 2261 - 2265
  • [50] Multi-mode resource constrained multi-project scheduling and resource portfolio problem
    Besikci, Umut
    Bilge, Umit
    Ulusoy, Gunduz
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 240 (01) : 22 - 31