共 50 条
- [41] Spreading mechanism of underground mine fire based on the complex network [J]. Computer Modelling and New Technologies, 2014, 18 (12): : 483 - 488
- [43] Study on Vehicle Routing and Scheduling Problems in Underground Mine Based on Adaptively ACA [J]. MECHATRONICS AND APPLIED MECHANICS, PTS 1 AND 2, 2012, 157-158 : 1293 - 1296
- [44] A simulation–optimization framework for short-term underground mine production scheduling [J]. Optimization and Engineering, 2020, 21 : 939 - 971
- [49] Improving Short- and Long-term Stability of Underground Gypsum Mine Using Partial and Total Backfill [J]. Rock Mechanics and Rock Engineering, 2010, 43 : 447 - 461