An analysis of a structured benchmarking project The case of Dubai Electricity and Water Authority's benchmarking project

被引:3
|
作者
Al Nuseirat, Ahmad Abdullah [1 ]
El Kahlout, Zeyad Mohammad [1 ]
Abbas, Ahmed [2 ]
Adebanjo, Dotun [3 ]
Punnakitikashem, Prattana [4 ]
Mann, Robin [2 ]
机构
[1] Off Execut Council, Dubai Govt Excellence Program, Dubai, U Arab Emirates
[2] Massey Univ, Ctr Org Excellence Res, Auckland, New Zealand
[3] Univ Greenwich, Sch Business, London, England
[4] Mahidol Univ, Coll Management, Bangkok, Thailand
关键词
Benchmarking; Dubai; DEWA; DGEP; TRADE benchmarking methodology; PERFORMANCE; IMPLEMENTATION; FRAMEWORK; IMPROVE; SME;
D O I
10.1108/BIJ-02-2018-0032
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose The purpose of this paper is to investigate a benchmarking project carried out by the Dubai Electricity and Water Authority (DEWA) as part of a structured benchmarking initiative. The project was based on the TRADE benchmarking methodology and this paper examines the tools, activities and outcomes that relate to each stage of the adopted methodology. Design/methodology/approach This study is based on case study methodology. Data were collected from various sources including analysis of project reports written by DEWA's benchmarking team reporting on their activities during the project. Data were also collected from four project presentations given at different stages of the project. In addition, the research team held three meetings with the DEWA benchmarking team at different stages of the benchmarking project. Findings The results show the key challenges and successes faced during each stage of the benchmarking project. It indicates the actions taken to overcome the challenges and the role played by internal and external stakeholders in facilitating the success of the benchmarking project. Originality/value Academic research has not adequately examined and analysed the stage-by-stage elements of a benchmarking project from the perspective of the implementing organisation. This study addresses this gap by detailing and analysing the experiences of a benchmarking project by tracking the stage-by-stage activities of the benchmarking team.
引用
收藏
页码:1431 / 1450
页数:20
相关论文
共 50 条
  • [41] Measuring and benchmarking managerial efficiency of project execution schedule performance
    Iyer, K. Chandrashekhar
    Banerjee, Partha S.
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (02) : 219 - 236
  • [42] Austrian benchmarking project for ERCP: a 10-year report
    Kienbauer, Melanie
    Duller, Christine
    Gschwantler, Michael
    Puespoek, Andreas
    Schoefl, Rainer
    Kapral, Christine
    [J]. ZEITSCHRIFT FUR GASTROENTEROLOGIE, 2018, 56 (10): : 1227 - 1236
  • [43] BENCHMARKING AS AN INSTRUMENT FOR THE MANAGEMENT OF LOGISTICS PROJECT LOCATION IN URBAN AREAS
    Pawlak, Zbyszko
    Bandosz, Lukasz
    [J]. LOGFORUM, 2009, 5 (02)
  • [44] Benchmarking Infrastructure Project Finance: Objectives, Roadmap, and Recent Progress
    Blanc-Brude, Frederic
    Hasan, Majid
    Whittttaker, Tim
    [J]. JOURNAL OF ALTERNATIVE INVESTMENTS, 2016, 19 (02): : 7 - 18
  • [45] Benchmarking a future transportation system:: a simulation library for the SAT® project
    van Duin, JHR
    Yin, L
    Serrano, J
    Pecorari, NA
    Serrano, V
    [J]. URBAN TRANSPORT X: URBAN TRANSPORT AND THE ENVIRONMENT IN THE 21ST CENTURY, 2004, 16 : 299 - 309
  • [46] Evaluation of benchmarking indicators of Sanjay Sarovar Irrigation Project, India
    Rani P.
    Singh A.
    [J]. Sustainable Water Resources Management, 2018, 4 (3) : 425 - 432
  • [47] Benchmarking construction industry, company and project performance by participants' evaluation
    Karna, Sami
    Junnonen, Juha-Matti
    [J]. BENCHMARKING-AN INTERNATIONAL JOURNAL, 2016, 23 (07) : 2092 - 2108
  • [48] Benchmarking in psychiatric acute care a demonstration project in a hospitals network
    Janssen, Birgit
    van Brederode, Michael
    Kitzig, Friedhelm
    Schmidt-Kraepelin, Christian
    Ohm, Sven
    Gaebel, Wolfgang
    [J]. ZEITSCHRIFT FUR EVIDENZ FORTBILDUNG UND QUALITAET IM GESUNDHEITSWESEN, 2011, 105 (05): : 371 - 375
  • [49] Project Snowball - sharing data for cross-institutional benchmarking
    Colledge, Lisa
    Clements, Anna
    el Aisati, M'hamed
    Rutherford, Scott
    [J]. E-INFRASTRUCTURES FOR RESEARCH AND INNOVATION: LINKING INFORMATION SYSTEMS TO IMPROVE SCIENTIFIC KNOWLEDGE PRODUCTION, 2012, : 253 - 260
  • [50] European Hospital Benchmarking in Acute Coronary Syndrome: the EURHOBOP project
    Kirchberger, I.
    Azevedo, A.
    Davoli, M.
    Farmakis, D.
    Ferrieres, J.
    Garel, P.
    Haekkinen, U.
    Marrugat, J.
    Torre, M.
    Meisinger, C.
    [J]. EUROPEAN HEART JOURNAL, 2012, 33 : 297 - 297