Reliability Evaluation of The New Generation Smart Substation Considering Relay Protection System

被引:0
|
作者
Zhang, Ji [1 ]
Kang, Qiaoping [1 ]
Huang, Dawei [1 ]
Xiong, Xiuwen [1 ]
Liu, Yang [2 ]
Ma, Jin [2 ]
Chen, Yanbo [2 ]
Cai, Yong [3 ]
机构
[1] State Grid Hubei Econ & Technol Res Inst, Wuhan 430077, Peoples R China
[2] North China Elect Power Univ, State Key Lab New Energy Power Syst, Beijing 102206, Peoples R China
[3] State Grid Hubei Elect Power Co, Wuhan 430077, Peoples R China
关键词
the new generation smart substation; relay protection system; minimum path algorithm; reliability evaluation; equivalent index;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The new generation smart substation has become the future development direction of substation. At present, the reliability assessment method of the new generation smart substation are based on substation system itself or relay protection system separately, without considering the comprehensive influence of these two systems, leading high reliability index obtained. Based on minimum path algorithm, this paper firstly establishes the reliability assessment model of the new generation smart substation considering relay protection system. Then, an equivalent reliability index considering the comprehensive influence of the primary system and relay protection system is proposed. Finally, the proposed model and approach are tested on a real new generation smart substation.
引用
收藏
页码:1164 / 1168
页数:5
相关论文
共 50 条
  • [21] Research On The New Generation Smart Substation
    Tao Jing
    Huang Zaichao
    Deng Hui
    Wang Wei
    Chen Lei
    Shen Wen
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON MECHANICAL ENGINEERING AND INTELLIGENT SYSTEMS (ICMEIS 2015), 2015, 26 : 218 - 221
  • [22] Performance and Reliability Assessment of Protection System in IEC 61850-Based Smart Substation
    He, Ruiwen
    He, Xiaowang
    Lv, Mengli
    Cai, Zexiang
    Li, Xiaohua
    Zhu, Lin
    2014 IEEE PES INNOVATIVE SMART GRID TECHNOLOGIES CONFERENCE EUROPE (ISGT EUROPE), 2014,
  • [23] Key Technology of Relay Protection System-level Testing Considering Comprehensive Optimization of Substation Secondary System
    Meng J.
    Li Z.
    Zhan R.
    Mou L.
    Zhou Z.
    Xu K.
    Yu Y.
    Ren Y.
    Dianwang Jishu/Power System Technology, 2023, 47 (09): : 3791 - 3798
  • [24] Risk Assessment of Smart Substation Relay Protection System Based on Markov Model and Risk Transfer Network
    Nan, Dongliang
    Wang, Weiqing
    Mahfoud, Rabea Jamil
    Alhelou, Hassan Haes
    Siano, Pierluigi
    Parente, Mimmo
    Zhang, Lu
    ENERGIES, 2020, 13 (07)
  • [25] Relay Protection State Evaluation of Smart Substation Based on Fuzzy Comprehensive Evaluation and Improved D-S Theory
    Shen, Hong-shan
    Wang, Lei-tao
    Chen, Ye-wei
    INTERNATIONAL CONFERENCE ON MATERIAL SCIENCE AND CIVIL ENGINEERING, MSCE 2016, 2016, : 696 - 706
  • [26] Reliability Evaluation for Cyber-Physical Smart Substation
    Chen, Yangrong
    Li, Jun'e
    Xu, Ang
    Yuan, Kai
    Liu, Kaipei
    COMPLEXITY, 2021, 2021
  • [27] Intelligent substation protection system reliability assessment method considering the aging of equipment and planned maintenance
    Guo S.
    Tong X.
    Wang H.
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2019, 47 (09): : 97 - 104
  • [28] Development and Analysis of Core IEC Standards for Smart Substation Automation and Relay Protection
    Chen D.
    Xu L.
    Zhao X.
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2019, 43 (21): : 229 - 239
  • [29] An Evaluation Strategy for Microgrid Reliability Considering the Effects of Protection System
    Xu, Xufeng
    Mitra, Joydeep
    Wang, Tingting
    Mu, Longhua
    IEEE TRANSACTIONS ON POWER DELIVERY, 2016, 31 (05) : 1989 - 1997
  • [30] Power system reliability analysis considering substation interior
    Chen, Chen
    Liu, Junyong
    Liu, Youbo
    Jiang, Changjiang
    Gou, Jing
    Liu, Ruofan
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2015, 35 (02): : 103 - 109