Open pit mine planning considering geomechanical fundamentals

被引:9
|
作者
Parra, Andres [1 ,2 ,3 ]
Morales, Nelson [1 ,2 ,3 ]
Vallejos, Javier [2 ,3 ]
Phu Minh Vuong Nguyen [1 ,2 ,3 ]
机构
[1] Univ Chile, Delphos Mine Planning Lab, Santiago, Chile
[2] Univ Chile, Min Engn Dept, Santiago, Chile
[3] Univ Chile, Adv Min Technol Ctr, Santiago, Chile
关键词
Open pit mine planning; slope design; slope stability; factor of safety; open pit mine designs;
D O I
10.1080/17480930.2017.1278579
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The objective of this study is to integrate the admissible factor of safety (FoS) into the mine planning. The analysis showed, as expected, that a lower net present value (NPV) is obtained with the increase in the admissible FoS. Most importantly, it demonstrated that the FoS of the slopes of the adjacent phases, which are not part of the final pit, are considerably greater than the admissible FoS. Therefore, the NPV of an open pit mine project can be increased by steepening the slopes of adjacent phases that are not part of the final pit walls.
引用
收藏
页码:221 / 238
页数:18
相关论文
共 50 条
  • [41] Swelling rocks in an open pit mine
    Bilir, M. E.
    Aydingun, E.
    ROCK MECHANICS FOR RESOURCES, ENERGY AND ENVIRONMENT, 2013, : 647 - 651
  • [42] Open pit mine production scheduling
    Caccetta, L
    Kelsey, P
    Giannini, L
    THIRD REGIONAL APCOM: COMPUTER APPLICATIONS IN THE MINERALS INDUSTRIES INTERNATIONAL SYMPOSIUM, 1998, 98 (05): : 65 - 72
  • [43] NACIMIENTO OPEN PIT COPPER MINE
    KRAUSSE, DM
    HALL, WB
    MINING CONGRESS JOURNAL, 1971, 57 (11): : 75 - &
  • [45] Real options decision framework: Strategic operating policies for open pit mine planning
    Inthavongsa, Inthanongsone
    Drebenstedt, Carsten
    Bongaerts, Jan
    Sontamino, Phongpat
    RESOURCES POLICY, 2016, 47 : 142 - 153
  • [46] Prediction of Essential Amount of Exploration Drilling in Primary Stage of Open Pit Mine Planning
    Nourali, Hamidreza
    Osanloo, Morteza
    WORLD MULTIDISCIPLINARY EARTH SCIENCES SYMPOSIUM, WMESS 2015, 2015, 15 : 754 - 761
  • [47] The Influence of Rainfall on Landslide Stability of an Open-Pit Mine: The Case of Haizhou Open-Pit Mine
    An Bo
    Zhu Chun
    Liu Kuiming
    Li Sitong
    Tao Zhigang
    Li Haipeng
    Yu Haoran
    Geotechnical and Geological Engineering, 2019, 37 : 3367 - 3378
  • [48] The Influence of Rainfall on Landslide Stability of an Open-Pit Mine: The Case of Haizhou Open-Pit Mine
    An Bo
    Zhu Chun
    Liu Kuiming
    Li Sitong
    Tao Zhigang
    Li Haipeng
    Yu Haoran
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2019, 37 (04) : 3367 - 3378
  • [49] Block size selection and its impact on open-pit design and mine planning
    Jara, RM
    Couble, A
    Emery, X
    Magri, EJ
    Ortiz, JM
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 2006, 106 (03): : 205 - 211
  • [50] Ultimate slope design in open pit phosphate mine using geological and geomechanical analysis: case study of Jebel Jebbeus
    Rahma Ahmadi
    Moufida El May
    Mahmoud Dlala
    Arabian Journal of Geosciences, 2019, 12