An order acceptance strategy under limited engineering man-hours for cost estimation in Engineering-Procurement-Construction projects

被引:23
|
作者
Ishii, Nobuaki [1 ]
Takano, Yuichi [2 ]
Muraki, Masaaki [2 ]
机构
[1] Bunkyo Univ, Fac Informat & Commun, Chigasaki, Kanagawa 2538550, Japan
[2] Tokyo Inst Technol, Grad Sch Decis Sci & Technol, Meguro Ku, Tokyo 1528550, Japan
关键词
Engineering and construction; Bidding; Cost estimation; Man-hour constraint;
D O I
10.1016/j.ijproman.2013.07.009
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Accurate cost estimation is essential for any Engineering Procurement Construction (EPC) contractor accepting profitable projects because the project price is determined prior to receiving the contract. Therefore the contractor needs to ensure engineering man-hours (MH) in order to estimate project costs accurately as well as carry out the accepted orders. In this paper, we develop MH based order acceptance strategies and investigate their effects on the total expected profit through a long-term operation in EPC projects under a competitive bidding situation. To this end we build a simulation model describing relations among the volume of MH for cost estimation, accepted orders, revenues, and profits in EPC projects. Using our model, we show that the strategy, which maintains the appropriate balance of MH for cost estimation and project execution under the variability of accepted orders with competitive bidding situations, improves the total expected profit in EPC projects. (C) 2013 Elsevier Ltd. APM and IPMA. All rights reserved.
引用
收藏
页码:519 / 528
页数:10
相关论文
共 16 条
  • [1] Subcontracting and rework cost sharing in engineering-procurement-construction projects
    Chen, Zhenzhen
    Zhu, Wanshan
    Crama, Pascale
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2023, 262
  • [2] A Heuristic Bidding Price Decision Algorithm Based on Cost Estimation Accuracy Under Limited Engineering Man-Hours in EPC Projects
    Ishii, Nobuaki
    Takano, Yuichi
    Muraki, Masaaki
    [J]. SIMULATION AND MODELING METHODOLOGIES, TECHNOLOGIES AND APPLICATIONS (SIMULTECH), 2015, 319 : 101 - 118
  • [3] CAUSES OF CONTRACTORS' CLAIMS IN INTERNATIONAL ENGINEERING-PROCUREMENT-CONSTRUCTION PROJECTS
    Shen, Wenxin
    Tang, Wenzhe
    Yu, Wenyang
    Duffield, Colin F.
    Hui, Felix Kin Peng
    Wei, Yongping
    Fang, Jun
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2017, 23 (06) : 727 - 739
  • [4] Evaluating the Engineering-Procurement-Construction Approach and Whole Process Engineering Consulting Mode in Construction Projects
    Zizhen Shen
    Jingyang Zhao
    Man Guo
    [J]. Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2023, 47 : 2533 - 2547
  • [5] Evaluating the Engineering-Procurement-Construction Approach and Whole Process Engineering Consulting Mode in Construction Projects
    Shen, Zizhen
    Zhao, Jingyang
    Guo, Man
    [J]. IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2023, 47 (04) : 2533 - 2547
  • [6] Enhancing Trust-Based Interface Management in International Engineering-Procurement-Construction Projects
    Shen, Wenxin
    Tang, Wenzhe
    Wang, Shuli
    Duffield, Colin F.
    Hui, Felix Kin Peng
    You, Richun
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (09)
  • [7] Research on the BIM Application Mechanism of Engineering-Procurement-Construction Projects Based on a Tripartite Evolutionary Game
    Sun, Chengshuang
    Wang, Min
    Man, Qingpeng
    Wan, Dongjun
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (03)
  • [8] Engineering-Procurement-Construction (EPC) mega project: Analysis of the dominant cost factors and viable solutions
    Reeky, Muhammad Andry
    Arviansyah
    [J]. BUSINESS INNOVATION AND DEVELOPMENT IN EMERGING ECONOMIES, 2019, : 493 - 506
  • [9] Risk evaluation of mega infrastructure construction supply chain in engineering-procurement-construction projects: an integrated fuzzy AHP and fuzzy DEMATEL approach
    Yu, Runze
    Ma, Li
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024,
  • [10] Conceptual Cost Estimation Model for Engineering Services in Public Construction Projects
    Hyari, Khaled Hesham
    Al-Daraiseh, Ahmad
    El-Mashaleh, Mohammad
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (01)