Subcontracting and rework cost sharing in engineering-procurement-construction projects

被引:2
|
作者
Chen, Zhenzhen [1 ]
Zhu, Wanshan [2 ]
Crama, Pascale [3 ]
机构
[1] Tsinghua Univ, Dept Ind Engn, Beijing 100084, Peoples R China
[2] Renmin Univ China, Sch Business, Dept Management Sci & Engn, Beijing 100872, Peoples R China
[3] Singapore Management Univ, Dept Operat Management, Singapore 178899, Singapore
关键词
Incentive contract; Moral hazard; Project management; Rework; Subcontracting; QUALITY MANAGEMENT; SUPPLY CHAIN; UNCERTAINTY; INFORMATION; IMPROVEMENT; CONTRACT; JOINT;
D O I
10.1016/j.ijpe.2023.108901
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Infrastructure development projects are overwhelmingly managed through engineering-procurement-constru-ction (EPC) contracts, which allow a project end user to shift all project risks to a contractor. Accordingly, the International Federation of Consulting Engineers recommended a contract template based on a lump-sum contract between the end user and main contractor. However, EPC projects often suffer from quality issues due to moral hazard, which is aggravated by the involvement of subcontractors hired by the main contractor to perform parts of the project. Besides, costly rework is frequently needed to achieve the contractually mandated quality. When the main contractor must share some of the subcontractor's rework cost, an externality might arise. In this study, we model an EPC contract with three parties: the end user, the main contractor, and a representative subcontractor. We compare the end user's cost and quality trade-off for the recommended lump-sum contract and the proposed incentive contracts. We find that the lump-sum contract can achieve the first-best trade-off under limited circumstances, whereas the appropriate incentive contract can do so for a wider range of circumstances. Rework cost sharing can cause under-or over-investment in efforts and reduce system welfare compared to the first-best outcome by weakening the incentive contract's ability to overcome moral hazard. However, for a subcontractor with limited liability, rework cost sharing can improve project outcomes by allowing the main contractor to reduce the subcontractor's risk exposure.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] CAUSES OF CONTRACTORS' CLAIMS IN INTERNATIONAL ENGINEERING-PROCUREMENT-CONSTRUCTION PROJECTS
    Shen, Wenxin
    Tang, Wenzhe
    Yu, Wenyang
    Duffield, Colin F.
    Hui, Felix Kin Peng
    Wei, Yongping
    Fang, Jun
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2017, 23 (06) : 727 - 739
  • [2] Evaluating the Engineering-Procurement-Construction Approach and Whole Process Engineering Consulting Mode in Construction Projects
    Zizhen Shen
    Jingyang Zhao
    Man Guo
    [J]. Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2023, 47 : 2533 - 2547
  • [3] Evaluating the Engineering-Procurement-Construction Approach and Whole Process Engineering Consulting Mode in Construction Projects
    Shen, Zizhen
    Zhao, Jingyang
    Guo, Man
    [J]. IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2023, 47 (04) : 2533 - 2547
  • [4] An order acceptance strategy under limited engineering man-hours for cost estimation in Engineering-Procurement-Construction projects
    Ishii, Nobuaki
    Takano, Yuichi
    Muraki, Masaaki
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (03) : 519 - 528
  • [5] Enhancing Trust-Based Interface Management in International Engineering-Procurement-Construction Projects
    Shen, Wenxin
    Tang, Wenzhe
    Wang, Shuli
    Duffield, Colin F.
    Hui, Felix Kin Peng
    You, Richun
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (09)
  • [6] Research on the BIM Application Mechanism of Engineering-Procurement-Construction Projects Based on a Tripartite Evolutionary Game
    Sun, Chengshuang
    Wang, Min
    Man, Qingpeng
    Wan, Dongjun
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (03)
  • [7] Engineering-Procurement-Construction (EPC) mega project: Analysis of the dominant cost factors and viable solutions
    Reeky, Muhammad Andry
    Arviansyah
    [J]. BUSINESS INNOVATION AND DEVELOPMENT IN EMERGING ECONOMIES, 2019, : 493 - 506
  • [8] Research on the organizational knowledge diffusion in engineering-procurement-construction general contractor
    Wen Huijun
    Huang Mingzhi
    Wu Bing
    [J]. PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS I AND II, 2007, : 2024 - 2027
  • [9] Risk evaluation of mega infrastructure construction supply chain in engineering-procurement-construction projects: an integrated fuzzy AHP and fuzzy DEMATEL approach
    Yu, Runze
    Ma, Li
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024,
  • [10] Study on International Hydropower Engineering-Procurement-Construction Contractor-Designer Alliance
    Tang, Wenzhe
    Zhang, Qingzhen
    Huang, Yulei
    Liu, Yang
    [J]. Tongji Daxue Xuebao/Journal of Tongji University, 2019, 47 (03): : 444 - 450