Managing process chemicals, technology and equipment information for pilot plant based on Process Safety Management standard

被引:18
|
作者
Aziz, H. A. [1 ]
Shariff, A. M. [1 ]
Rusli, R. [1 ]
Yew, K. H. [1 ]
机构
[1] Univ Teknol PETRONAS, Dept Chem Engn, Proc Safety Res Grp, Tronoh 31750, Perak, Malaysia
关键词
Process safety information; Pilot plant; Process Safety Management; Hazardous chemicals; Process technology; Equipment information;
D O I
10.1016/j.psep.2014.02.011
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Injuries, accidents or even fatalities while working in pilot plant are reported worldwide. The OSHA Laboratory Standard and Hazard Communication Standard have been used as a guideline to manage safety of laboratories and pilot plant. In spite of the implementation of these standards, incidents which result in injuries and property loss are continuously occurring. The implementation of OSHA Process Safety Management (PSM) Standard in pilot plant is expected to further reduce the risks of accidents. This paper presents a new system for managing process chemicals, technology and equipment information in pilot plant and the concept is developed based on Process Safety Information (PSI) element of PSM 29 CFR 1910.119(d). It provides organized strategies to manage documentations, communicate information, and written program for maintaining, revising and updating related information. Process and Instrumentation Diagram (P&ID) is used as a foundation for data management. Implementation of this system at the CO2 Hydrocarbon Absorption System pilot plant as a case study is examined and discussed. (C) 2014 The Institution of Chemical Engineers. Published by Elsevier B.V. All rights reserved.
引用
收藏
页码:423 / 429
页数:7
相关论文
共 50 条
  • [31] Implementation of process analytical technology during process development in a pharmaceutical product pilot plant
    Kleissas, KM
    Higgins, JP
    Green, RL
    Pixley, N
    Witulski, F
    Bowen, WE
    Mateos, A
    Reed, RA
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 2005, 230 : U233 - U233
  • [32] Business Process Management and information technology infrastructure library in the version release management process
    de Oliveira Gatto, Dacyr Dante
    Prado Farias, Edquel Bueno
    Sassi, Renato Jose
    NAVUS-REVISTA DE GESTAO E TECNOLOGIA, 2019, 9 (03): : 69 - 84
  • [33] FERTILIZER TECHNOLOGY - PILOT PLANT STUDIES OF A NITRIC PHOSPHATE PROCESS
    VERSTEEGE, PM
    LUGT, W
    JOURNAL OF AGRICULTURAL AND FOOD CHEMISTRY, 1962, 10 (06) : 434 - &
  • [34] Managing a step based process plant life cycle
    Hawtin, JW
    Chung, PWH
    1997 JUBILEE RESEARCH EVENT, VOLS 1 AND 2, 1997, : 749 - 752
  • [35] Global Competence Management for Process & Plant Safety at Bayer
    Gasche, Hans-Erich
    Kussi, Juergen S.
    Buhn, Joern B.
    Weppelmann, Jan
    15TH INTERNATIONAL SYMPOSIUM ON LOSS PREVENTION AND SAFETY PROMOTION (LOSS 2016), 2016, 48 : 859 - 864
  • [36] Process safety management at the LTV Warren coke plant
    Fittipaldo, James J.
    Russell, Charles
    Cantelmo, Michael A.
    Iron and Steel Engineer, 1998, 75 (10): : 52 - 54
  • [37] Process safety management - Unions petition OSHA to regulate reactive chemicals
    Sissell, K
    CHEMICAL WEEK, 2003, 165 (22) : 41 - 41
  • [38] Deficiencies frequently encountered in the management of process safety information
    Liaw, Horng-Jang
    PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2019, 132 : 226 - 230
  • [39] Management of information technology using analytic hierarchy process
    Udo, GJ
    IEMC 96 PROCEEDINGS - MANAGING VIRTUAL ENTERPRISES: A CONVERGENCE OF COMMUNICATIONS, COMPUTING, AND ENERGY TECHNOLOGIES, 1996, : 690 - 697
  • [40] Information Technology for Business Process Management: Case of Croatia
    Milanovic Glavan, Ljubica
    VISION 2025: EDUCATION EXCELLENCE AND MANAGEMENT OF INNOVATIONS THROUGH SUSTAINABLE ECONOMIC COMPETITIVE ADVANTAGE, 2019, : 336 - 343