Implementing a quality indicator project on a national basis: a feasibility study

被引:0
|
作者
Vaandering, A. [1 ]
Lievens, Y. [2 ]
Jansen, N. [3 ]
Weltens, C. [4 ]
Moretti, L. [5 ]
Stellamans, K. [4 ]
Vanhoutte, F. [2 ]
Scalliet, P. [1 ]
Remouchamps, V. [6 ]
机构
[1] UCL Clin Univ St Luc, Dept Radiat Oncol, Brussels, Belgium
[2] Ghent Univ Hosp, Dept Radiat Oncol, Ghent, Belgium
[3] Univ Hosp Liege, Dept Radiat Oncol, Liege, Belgium
[4] AZ Groeninge, Dept Radiat Oncol, Kortrijk, Belgium
[5] Inst Jules Bordet, Dept Radiat Oncol, Brussels, Belgium
[6] CHU UCL Namur Site St Elisabeth, Dept Radiat Oncol, Namur, Belgium
关键词
D O I
10.1016/S0167-8140(19)31017-5
中图分类号
R73 [肿瘤学];
学科分类号
100214 ;
摘要
OC-0597
引用
收藏
页码:S313 / S314
页数:2
相关论文
共 50 条
  • [42] Implementing the national air quality strategy in the United Kingdom
    Elsom, DM
    Crabbe, H
    AIR POLLUTION IV: MONITORING, SIMULATION AND CONTROL, 1996, : 823 - 836
  • [43] Implementing national quality standards in a rural hospital setting
    Steininger, Patrice
    ONCOLOGY NURSING FORUM, 2008, 35 (03) : 501 - 501
  • [44] Going Beyond: Implementing "Beyond Quality" through the Investigating Quality (IQ) Project
    Pence, Alan
    JOURNAL OF RESEARCH IN CHILDHOOD EDUCATION, 2021, 35 (03) : 520 - 533
  • [45] Feasibility Study on Evolving Yunnan Blow Gun Movement into the National Minority Traditional Sports Project
    Qian, Guangtian
    2013 3RD INTERNATIONAL CONFERENCE ON EDUCATION AND EDUCATION MANAGEMENT (EEM 2013), 2013, 25 : 312 - 315
  • [46] Water Quality as an Indicator of Stream Restoration EffectsA Case Study of the Kwacza River Restoration Project
    Mrozinska, Natalia
    Glinska-Lewczuk, Katarzyna
    Burandt, Pawel
    Kobus, Szymon
    Gotkiewicz, Wojciech
    Szymanska, Monika
    Bakowska, Martyna
    Obolewski, Krystian
    WATER, 2018, 10 (09)
  • [47] ERP Project Implementing Personnel Case Study
    Zhang Yuesheng
    MEMS, NANO AND SMART SYSTEMS, PTS 1-6, 2012, 403-408 : 305 - 308
  • [48] Implementing project management in a utility: A case study
    Bolz, D
    OMalley, JJ
    Overbye, D
    PROCEEDINGS OF THE AMERICAN POWER CONFERENCE, VOL 58, PTS I AND II, 1996, 58 : 1020 - 1025
  • [49] The CATRIONA project: Feasibility study and outcomes
    Fletcher, M
    PROGRAM-AUTOMATED LIBRARY AND INFORMATION SYSTEMS, 1996, 30 (02): : 99 - 109
  • [50] Implementing Developmental Screening and Referrals: Lessons Learned From a National Project
    King, Tracy M.
    Tandon, S. Darius
    Macias, Michelle M.
    Healy, Jill A.
    Duncan, Paula M.
    Swigonski, Nancy L.
    Skipper, Stephanie M.
    Lipkin, Paul H.
    PEDIATRICS, 2010, 125 (02) : 350 - 360