Evaluation of gas well productivity in low permeability gas reservoirs based on a modified back-pressure test method

被引:1
|
作者
Wang Hui [1 ]
Zhang Peijun [2 ]
Cheng Youyou [3 ]
Leng Youheng [2 ]
Guo Chunqiu [1 ]
Shi Haidong [1 ]
Wei Zhanjun [2 ]
Liu Lingli [1 ]
Shi Liyong [1 ]
Cheng Muwei [1 ]
Xiang Hongying [2 ]
机构
[1] PetroChina Res Inst Petr Explorat & Dev, Beijing 100083, Peoples R China
[2] CNPC Int TURKMENISTAN, Ashkhabad 744015, Turkmenistan
[3] Southwest Petr Univ, Chengdu 610500, Peoples R China
关键词
low permeability gas reservoir; bottom-hole flowing pressure; modified backpressure test; process conversion-flowing pressure correction; productivity evaluation;
D O I
10.1016/S1876-3804(14)60057-4
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In view of the long pressure stabilization time of low permeability gas reservoirs, the traditional backpressure test was modified based on the idea of isochronal test in order to evaluate gas well productivity accurately. Firstly, carry out continuous well startup using 3-4 incremental working systems at the same time interval without the bottom-hole flowing pressure reaching stability; then carry out a prolonged test using a reasonable working system which requires both the bottom-hole flowing pressure and the production reaching stability; finally shut in the well to allow the pressure recover to formation pressure. If the isochronal test productivity calculation method is borrowed for the modified backpressure test, the drawdown pressure will be overestimated, and calculated productivity will be underestimated. The "process conversion-flowing pressure correction" was used to convert the test process into an isochronal test process, and the bottom-hole flowing pressure correction equation was deduced based on pressure superposition principle to solve the productivity calculation problem with this method. The example indicates that the modified backpressure test method can not only shorten the test time significantly and avoid frequent well startup and shut-in, but also can ensure the accuracy of productivity calculation.
引用
收藏
页码:500 / 503
页数:4
相关论文
共 50 条
  • [21] A METHOD FOR DETERMINING RECOVERY FACTORS IN LOW PERMEABILITY GAS RESERVOIRS
    HARLAN, LE
    DEGOLYER
    MACNAUGH.
    JOURNAL OF PETROLEUM TECHNOLOGY, 1966, 18 (09): : 1103 - &
  • [23] Forecast of fractured horizontal well productivity in dual permeability layers in volcanic gas reservoirs
    Wang Zhiping
    Ran Bo
    Tong Min
    Wang Chunming
    Yue Qingfeng
    PETROLEUM EXPLORATION AND DEVELOPMENT, 2014, 41 (05) : 642 - 647
  • [24] A NEW UNSTEADY PRODUCTIVITY PREDICTION METHOD OF FRACTURING HORIZONTAL WELLS IN LOW-PERMEABILITY GAS RESERVOIRS
    Chen, Jiaoni
    Li, Tiantai
    Wu, Shenghe
    FRESENIUS ENVIRONMENTAL BULLETIN, 2019, 28 (4A): : 3300 - 3308
  • [25] The Seepage Pressure Distribution and the Capacity of Low-permeability Reservoirs Gas
    Yan, Liangdong
    Gao, Zhijuan
    RESOURCES AND SUSTAINABLE DEVELOPMENT, PTS 1-4, 2013, 734-737 : 1317 - 1323
  • [26] LOW-PERMEABILITY GAS WELL PERFORMANCE AT CONSTANT PRESSURE
    STEWART, PR
    JOURNAL OF PETROLEUM TECHNOLOGY, 1970, 22 (SEP): : 1149 - &
  • [27] PRODUCTION EVALUATION AND PREDICTION OF HORIZONTAL WELL BASED ON GREY CORRELATION METHOD IN LOW PERMEABILITY GAS RESERVOIR
    Zhang, Jianguo
    He, Lei
    Zhao, Chenyang
    Cao, Chenyu
    Yang, Fei
    Liu, Feng
    FRESENIUS ENVIRONMENTAL BULLETIN, 2022, 31 (06): : 5949 - 5954
  • [28] A new method for calculating the productivity of abnormally high-pressure gas reservoirs considering variable permeability modulus
    Ren, J. (renjunjie1900@126.com), 1600, Natural Gas Industry Journal Agency (33):
  • [29] Parametric investigation of well testing analysis in low permeability gas condensate reservoirs
    Mohammadi, Hossein
    Sedaghat, Mohammad Hossein
    Manshad, Abbas Khaksar
    JOURNAL OF NATURAL GAS SCIENCE AND ENGINEERING, 2013, 14 : 17 - 28
  • [30] Intelligent production optimization method for a low pressure and low productivity shale gas well附视频
    ZHU Qikang
    LIN Botao
    YANG Guang
    WANG Lijia
    CHEN Man
    Petroleum Exploration and Development, 2022, (04) : 886 - 894