Evaluation of gas well productivity in low permeability gas reservoirs based on a modified back-pressure test method

被引:1
|
作者
Wang Hui [1 ]
Zhang Peijun [2 ]
Cheng Youyou [3 ]
Leng Youheng [2 ]
Guo Chunqiu [1 ]
Shi Haidong [1 ]
Wei Zhanjun [2 ]
Liu Lingli [1 ]
Shi Liyong [1 ]
Cheng Muwei [1 ]
Xiang Hongying [2 ]
机构
[1] PetroChina Res Inst Petr Explorat & Dev, Beijing 100083, Peoples R China
[2] CNPC Int TURKMENISTAN, Ashkhabad 744015, Turkmenistan
[3] Southwest Petr Univ, Chengdu 610500, Peoples R China
关键词
low permeability gas reservoir; bottom-hole flowing pressure; modified backpressure test; process conversion-flowing pressure correction; productivity evaluation;
D O I
10.1016/S1876-3804(14)60057-4
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In view of the long pressure stabilization time of low permeability gas reservoirs, the traditional backpressure test was modified based on the idea of isochronal test in order to evaluate gas well productivity accurately. Firstly, carry out continuous well startup using 3-4 incremental working systems at the same time interval without the bottom-hole flowing pressure reaching stability; then carry out a prolonged test using a reasonable working system which requires both the bottom-hole flowing pressure and the production reaching stability; finally shut in the well to allow the pressure recover to formation pressure. If the isochronal test productivity calculation method is borrowed for the modified backpressure test, the drawdown pressure will be overestimated, and calculated productivity will be underestimated. The "process conversion-flowing pressure correction" was used to convert the test process into an isochronal test process, and the bottom-hole flowing pressure correction equation was deduced based on pressure superposition principle to solve the productivity calculation problem with this method. The example indicates that the modified backpressure test method can not only shorten the test time significantly and avoid frequent well startup and shut-in, but also can ensure the accuracy of productivity calculation.
引用
收藏
页码:500 / 503
页数:4
相关论文
共 50 条
  • [1] METHOD OF ESTABLISHING A STABILIZED BACK-PRESSURE CURVE FOR GAS WELLS PRODUCING FROM RESERVOIRS OF EXTREMELY LOW PERMEABILITY
    HAYMAKER, ER
    BINCKLEY, CW
    BURGESS, FR
    TRANSACTIONS OF THE AMERICAN INSTITUTE OF MINING AND METALLURGICAL ENGINEERS, 1949, 186 (03): : 71 - 82
  • [2] METHOD FOR PREDICTING THE BACK-PRESSURE BEHAVIOR OF LOW PERMEABILITY NATURAL GAS WELLS
    TEK, MR
    GROVE, ML
    POETTMANN, FH
    TRANSACTIONS OF THE AMERICAN INSTITUTE OF MINING AND METALLURGICAL ENGINEERS, 1957, 210 (11): : 302 - 309
  • [3] Study on Computing Method of Productivity for Single Well in Low-permeability Gas Reservoirs
    Qin, Jianhua
    Gao, Shusheng
    Liu, Huaxun
    ICMS2010: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION, VOL 1: ENGINEERING COMPUTATION AND FINITE ELEMENT ANALYSIS, 2010, : 139 - 143
  • [4] Productivity performance of open hole horizontal gas well for low permeability gas reservoirs
    Li, Yahui
    Feng, Yihan
    Li, Xin
    Zhong, Jibin
    Wang, Wei
    PETROLEUM SCIENCE AND TECHNOLOGY, 2024, 42 (02) : 169 - 189
  • [5] An Interpretation Method for a Gas Production Profile Based on the Temperature and Pressure Behavior of Low-Permeability Gas Reservoirs
    Haitao Li
    Yahui Li
    Yihan Feng
    Jibin Zhong
    Hongwen Luo
    Arabian Journal for Science and Engineering, 2020, 45 : 7773 - 7792
  • [6] An Interpretation Method for a Gas Production Profile Based on the Temperature and Pressure Behavior of Low-Permeability Gas Reservoirs
    Li, Haitao
    Li, Yahui
    Feng, Yihan
    Zhong, Jibin
    Luo, Hongwen
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2020, 45 (09) : 7773 - 7792
  • [7] Productivity Calculation for Fractured Wells in Low Permeability Gas Reservoirs
    Cai, Hua
    Zhang, Guohua
    Li, Yangfan
    PROCEEDINGS OF THE AASRI INTERNATIONAL CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS (IEA 2015), 2015, 2 : 410 - 413
  • [8] The Researches on Reasonable Well Spacing of Gas Wells in Deep and low Permeability Gas Reservoirs
    Bei, Yu Bei
    Hui, Li
    Lin, Li Dong
    2018 4TH INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING (ICEMEE 2018), 2018, 38
  • [9] FRACTURE EVALUATION WITH PRESSURE TRANSIENT TESTING IN LOW-PERMEABILITY GAS-RESERVOIRS
    LEE, WJ
    HOLDITCH, SA
    JOURNAL OF PETROLEUM TECHNOLOGY, 1981, 33 (09): : 1776 - 1792
  • [10] Improving Method Analysis of Stable Productivity in Low Permeability Gas-water Well
    Cao Guangsheng
    Yang Wenwu
    PROCEEDINGS OF 2011 INTERNATIONAL SYMPOSIUM - MULTI-FIELD COUPLING THEORY OF ROCK AND SOIL AND ITS APPLICATIONS IN EXPLOITATION AND UTILIZATION OF RESOURCES, 2011, : 122 - 126