After a brief review of the theoretical principles of road pricing this paper presents the results of a modelling exercise aimed at ascertaining the effects of road pricing on a large road network. For the study area we chose an important part of the road network of Belgium, situated in the corridor between the main cities of Brussels and Ghent. Simulations were carried out using an elastic static traffic assignment method. Special care was taken to use realistic parameters for resource costs, time costs, external environmental costs and tax rates. The reduction of traffic caused by the increased trip prices as well as the route changes induced by the tolls were taken into account. The main objective of tolling as considered in this paper is the maximisation of the social welfare gain but possible adverse effects of tolling on traffic streams are also investigated. The relative merits of cordon and corridor tolling schemes are discussed. A combination of these two tolling schemes appears to give the best results, both in terms of welfare gain and traffic streams.
机构:
Guangdong Inst Intelligent Mfg, Guangdong Key Lab Modern Control Technol, Guangzhou, Peoples R ChinaGuangdong Inst Intelligent Mfg, Guangdong Key Lab Modern Control Technol, Guangzhou, Peoples R China
Zhang, Dongbo
Zhang, Wei
论文数: 0引用数: 0
h-index: 0
机构:
Natl Radio & Televis Adm, Acad Broadcasting Sci, Beijing 100866, Peoples R ChinaGuangdong Inst Intelligent Mfg, Guangdong Key Lab Modern Control Technol, Guangzhou, Peoples R China
Zhang, Wei
Yang, Rui
论文数: 0引用数: 0
h-index: 0
机构:
Guangdong Inst Intelligent Mfg, Guangdong Key Lab Modern Control Technol, Guangzhou, Peoples R ChinaGuangdong Inst Intelligent Mfg, Guangdong Key Lab Modern Control Technol, Guangzhou, Peoples R China
Yang, Rui
Guo, Mamman
论文数: 0引用数: 0
h-index: 0
机构:
Natl Chiao Tung Univ, Inst Management, Hsinchu 30050, TaiwanGuangdong Inst Intelligent Mfg, Guangdong Key Lab Modern Control Technol, Guangzhou, Peoples R China