Channel response to sediment replenishment in a large gravel-bed river: The case of the Saint-Sauveur dam in the Buech River (Southern Alps, France)

被引:38
|
作者
Brousse, Guillaume [1 ]
Arnaud-Fassetta, Gilles [1 ]
Liebault, Frederic [2 ]
Bertrand, Melanie [2 ]
Melun, Gabriel [3 ]
Loire, Remi [4 ]
Malavoi, Jean-Rene [4 ]
Fantino, Guillaume [5 ]
Borgniet, Laurent [6 ]
机构
[1] Univ Paris Diderot Paris 7, UMR 8586 PRODIG, F-75013 Paris, France
[2] Univ Grenoble Alpes, ETNA, Irstea, Grenoble, France
[3] AFB, DREC, Vincennes, France
[4] EDF, DPIH CIH, Lyon, France
[5] GEOPEKA, Lyon, France
[6] Univ Grenoble Alpes, LESSEM, Irstea, Grenoble, France
关键词
braided river; dam impact; restoration; river management; sediment replenishment; UNCERTAINTY; MANAGEMENT; REACHES; BUDGET;
D O I
10.1002/rra.3527
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The Saint-Sauveur dam was built in 1992 in the middle section of the Buech River. Downstream of the dam, a channel incision by several meters was observed. A gravel replenishment operation was planned in order to restore the active channel. An equivalent of two times the mean annual bedload-transport capacity (43,500 m(3)) was replenished downstream of the dam in September 2016. The aim of this paper is to quantify morphological change associated with sediment remobilization in order to evaluate the efficiency of the restoration works. The monitoring was based on a combination of (a) change detection using sequential high-resolution digital elevation models (from airborne LiDAR data), (b) bedload tracing using active ultrahigh-frequency radio-frequency identification technology, and (c) complementary field surveys of channel grain-size distribution and morphology for bedload-transport computation. Field monitoring allows us to capture a net aggradation along a 2-km reach after the first post-replenishment flood. A sediment balance analysis was performed to back-calculate bedload supply coming from the sluicing operation during the flood. Although the sediment replenishment operation clearly had a positive impact on the morphological conditions of the starved river reach, the effective bedload supply from artificial berms (22,650 m(3)) was insufficient to initiate substantial channel shifting along the restored reach and a subsequent amplification of the sediment recharge. The combination of high-resolution topographic resurveys and sediment tracing was successful to evaluate the downstream propagation of sediment replenishment effects.
引用
收藏
页码:880 / 893
页数:14
相关论文
共 33 条
  • [31] Conceptual framework and interdisciplinary approach for the sustainable management of gravel-bed rivers: The case of the Drôme River basin (S.E. France)
    Didier Pont
    Hervé Piégay
    Aude Farinetti
    Sophie Allain
    Norbert Landon
    Frédéric Liébault
    Bernard Dumont
    Alexandra Richard-Mazet
    Aquatic Sciences, 2009, 71
  • [32] Controls of channel morphology and sediment concentration on flow resistance in a large sand-bed river: A case study of the lower Yellow River
    Ma, Yuanxu
    Huang, He Qing
    GEOMORPHOLOGY, 2016, 264 : 132 - 146
  • [33] Twenty-five years of hydromorphological restoration in the high-energy, gravel-bed rivers of southern France: What are the current benefits for bedload dynamics and sediment balance in the left-bank tributaries of the Aude River within the
    Arnaud-Fassetta, Gilles
    Brun, Mathieu
    Brousse, Guillaume
    Michler, Luc
    Chauvet, Yannick
    Dorval, Iwen
    Flesch, Charles
    Gonod, Blanche
    Magallon, Nais
    Pignot, Keo
    Thas, Elisa
    Yvars, Matteo
    Berthelot, Perrine
    Tourade, Fabien
    Cuisenier, Charlotte
    Jouanny, Julie
    Krouch, Megane
    Espiaut, Marc-Aurelien
    Fontanieu, Nicolas
    Bellon, Typhaine
    Perrine, Lea
    Walentin, Virginie
    Gros, Jeremy
    Vallin, Theo
    Theureaux, Olivier
    Chabre, Clement
    Picot, Marion
    Fort, Monique
    Melun, Gabriel
    Mercier, Olivier
    Tomanova, Sylvie
    Corenblit, Dov
    Housset, Frederic
    Dupuis, Mathieu
    Pouillat, Mathilde
    GEOMORPHOLOGIE-RELIEF PROCESSUS ENVIRONNEMENT, 2024, 30 (02):