Research On The Optimum Cable Release Length Of ROVs

被引:0
|
作者
Li Lin [1 ]
Zhang Yanhui [2 ]
Yang Ping [2 ]
机构
[1] Wuhan DongHu Univ, Wuhan, Hubei, Peoples R China
[2] China Classificat Soc, Wuhan Rules & Res Inst, Wuhan, Hubei, Peoples R China
关键词
self-propelled cable-controlled vehicle; cable towrope resistance; optimum cable release length;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
To study a self-propelled cable-controlled vehicle's movement, operation and control, the function of its cable's towrope resistance is needed. Through calculating towrope resistances of the vehicle under different cable release lengths, the functional relation between the vehicle's movement location and the towrope resistance, the optimum cable release length at which the towrope resistance is the smallest could be found, which provides a foundation for further research of ROVs' movement, operation and control.
引用
收藏
页码:304 / 309
页数:6
相关论文
共 50 条
  • [41] Optimum design of cable-stayed bridges
    Yazdani-Paraei, H.
    Moharrami, H.
    Maalek, S.
    Heydari, M.
    AUSTRALIAN JOURNAL OF STRUCTURAL ENGINEERING, 2011, 12 (02) : 99 - 117
  • [42] Research on control limit of cable length error of cable-strut systems based on reliability theory and non-linear programming
    Wu, Tong
    Yuan, Xingfei
    Jiang, Shuhui
    Jianzhu Jiegou Xuebao/Journal of Building Structures, 2021, 42 (10): : 207 - 214
  • [43] Specifying cut-to-length cable
    Krebs, Jim
    Control Engineering, 2019, 66 (12) : 27 - 28
  • [44] RING OSCILLATOR MEASURES CABLE LENGTH
    ENNING, B
    EDN, 1994, 39 (10) : 90 - 90
  • [45] Study on Cable Length Measurement Methods
    Zhou, Yu
    Liu, Jihong
    Wu, Heng
    Zheng, Ying
    2017 29TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2017, : 7237 - 7241
  • [46] Distance and Cable Length Measurement System
    Elias Hernandez, Sergio
    Acosta, Leopoldo
    Toledo, Jonay
    SENSORS, 2009, 9 (12) : 10190 - 10200
  • [47] Cable Sizing and Effects of Cable Length on Dynamic Performance of Induction Motor
    Kirar, Mukesh Kumar
    Aginhotri, Ganga
    2012 IEEE FIFTH POWER INDIA CONFERENCE, 2012,
  • [48] Research Into Payload Swaying Reduction Through Cable Length Manipulation During Boom Crane Motion
    Kostikov, Alexander A.
    Perig, Alexander, V
    Larichkin, Oleksii, V
    Stadnik, Alexander N.
    Gribkov, Eduard P.
    FME TRANSACTIONS, 2019, 47 (03): : 464 - 476
  • [49] The Cable Crimp Levels Effect on TDR Cable Length Measurement System
    Song, Jianhui
    Yu, Yang
    Gao, Hongwei
    ADVANCES IN COMPUTER SCIENCE, ENVIRONMENT, ECOINFORMATICS, AND EDUCATION, PT I, 2011, 214 : 402 - 407
  • [50] Determination of optimum post-tensioning cable forces of cable-stayed bridges
    Hassan, M. M.
    Nassef, A. O.
    El Damatty, A. A.
    ENGINEERING STRUCTURES, 2012, 44 : 248 - 259