共 50 条
- [24] A control engineer's view of Bell's palsy [J]. IEEE CONTROL SYSTEMS MAGAZINE, 1998, 18 (01): : 63 - 64
- [25] INTERFACE SCHEDULING - A PROJECT CONTROL TOOL [J]. CHEMISTRY & INDUSTRY, 1984, (08) : 290 - 293
- [26] Entropy measurement as a project control tool [J]. International Journal of Project Management, 1999, 17 (06): : 343 - 350
- [27] Engineer Faces Potential Liability For Contractor's Project Delays [J]. CIVIL ENGINEERING, 2013, 83 (05): : 88 - 88
- [29] COMPARATIVE COST ESTIMATES FOR PROJECT CONTROL [J]. 33RD ANNUAL MEETING OF THE AMERICAN ASSOCIATION OF COST ENGINEERS, 1989, : 119 - 125