共 50 条
- [21] TAXONOMY OF PUBLIC PRIVATE PARTNERSHIP ON MASS RAILWAY TRANSIT DEVELOPMENT - A BENCHMARK WITH HONG KONG EXPERIENCE [J]. TRANSPORTATION SYSTEMS: ENGINEERING & MANAGEMENT, 2007, : 665 - 674
- [23] HONG-KONG MASS TRANSIT RAILWAY MODIFIED INITIAL SYSTEM - DESIGN AND CONSTRUCTION OF ABOVE-GROUND WORKS AND TRACKWORK [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1980, 68 (NOV): : 657 - 688
- [25] A SCHEDULE-BASED CAPACITY RESTRAINED TRANSIT ASSIGNMENT MODEL FOR SYSTEM PLANNING IN THIS INFORMATION AGE - APPLICATION TO THE HONG KONG MASS TRANSIT RAILWAY NETWORK [J]. TRANSPORTATION IN THE INFORMATION AGE: PROCEEDINGS OF THE 7TH CONFERENCE OF HONG KONG SOCIETY FOR TRANSPORTATION STUDIES, 2002, : 240 - 248
- [28] HONG-KONG MASS TRANSIT RAILWAY MODIFIED INITIAL SYSTEM - DESIGN AND CONSTRUCTION OF UNDERGROUND STATIONS AND CUT-AND-COVER TUNNELS [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1980, 68 (NOV): : 599 - 626