Case study of digital control systems for high-voltage substations

被引:0
|
作者
Propst, James [1 ]
Dood, Mike [1 ,2 ]
机构
[1] Western Area Power Adm, Huron, SD 57350 USA
[2] Schweitzer Engn Labs Inc, Pullman, WA 99163 USA
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper describes the design, implementation, and commissioning of a complete protection and control system retrofit project at a large transmission substation. Fort Thompson Substation, located in South Dakota, has two 345/230 kV step-down transformers with two 345 kV lines and twelve 230 kV lines. Western Area Power Administration (Western) undertook a project several years ago to completely renovate all the protection and control systems at this substation. They used the automation practices that Western had developed to reduce costs of new substation construction. While it is easy to cost justify integrating and automating systems when building a new substation, it is traditionally more difficult to justify automation system upgrade schemes when doing a renovation project. However, recent innovations in the integration capabilities of microprocessor-based protective relays, and other substation IEDs, make a complete integration system upgrade, including automation, cost effective compared to selective replacement of individual IEDs, wiring, and testing. This paper describes the justification and special challenges of automating an existing substation. It also discusses the overall system design concept of the integration and automation schemes that were employed. Topics covered in the paper include: Extensive use of fiber-optic cables to replace all control wiring in the yard Extensive use of multifunctional protection devices to eliminate wiring and equipment that would be required in a traditional design Replacement of hardwired lockout relays with "soft" logic Elimination of hardwired I/O to the RTU Project management tools used to ensure completion dates and to maintain budget Challenges of designing operator interface screens Impact on the workforce in migrating to a completely automated substation Insights gained in testing and commissioning the substation.
引用
收藏
页码:264 / +
页数:3
相关论文
共 50 条
  • [41] The Influence of Atmospheric Overvoltages on High-Voltage SF6 Substations
    Vukasovic, Vedran
    Baus, Zoran
    Barukcic, Marinko
    INTERNATIONAL JOURNAL OF ELECTRICAL AND COMPUTER ENGINEERING SYSTEMS, 2011, 2 (01) : 17 - 24
  • [42] An alternative approach for touch and step voltages measurement in high-voltage substations
    Kostic, Vojin I.
    Raicevic, Nebojsa B.
    ELECTRIC POWER SYSTEMS RESEARCH, 2016, 130 : 59 - 66
  • [43] DIGITAL CALCULATION OF LIGHTNING SURGE VOLTAGES IN HIGH-VOLTAGE TRANSMISSION SYSTEMS
    JOHANSEN, I
    HUSE, J
    PROCEEDINGS OF THE INSTITUTION OF ELECTRICAL ENGINEERS-LONDON, 1965, 112 (10): : 1933 - &
  • [44] Supervisory Control for High-Voltage Direct Current Transmission Systems
    Rodriguez, Miguel Romero
    Delpoux, Romain
    Pietrac, Laurent
    Dai, Jing
    Benchaib, Abdelkrim
    Niel, Eric
    IFAC PAPERSONLINE, 2017, 50 (01): : 12326 - 12332
  • [45] CONTROL FOR HIGH-VOLTAGE STEPPERS
    EKSTROM, PA
    HARNDEN, JA
    MACHINE DESIGN, 1983, 55 (06) : 102 - 102
  • [46] A CASE-STUDY OF A HIGH-VOLTAGE ELECTRICAL INJURY
    JONES, RO
    WRIGHT, JC
    JONES, WT
    BERGER, A
    JOURNAL OF THE AMERICAN PODIATRY ASSOCIATION, 1983, 73 (12): : 638 - 642
  • [47] Optimal Design of Grounding Systems for High Voltage Substations
    Ghods, Amirhossein
    Lee, Hong-hee
    Etemadi, Amirhossein
    2014 IEEE PES GENERAL MEETING - CONFERENCE & EXPOSITION, 2014,
  • [48] Investigation on new mitigation method for lightning overvoltages in high-voltage power substations
    Kuczek, Tomasz
    Stosur, Mariusz
    Szewczyk, Marcin
    Piasecki, Wojciech
    Steiger, Martin
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2013, 7 (10) : 1055 - 1062
  • [49] PREDICTION AND IMPROVEMENT OF THE ELECTRIC-FIELD DISTRIBUTION IN HIGH-VOLTAGE AC SUBSTATIONS
    YAN, Z
    LI, JX
    DONG, ZY
    ZHU, Y
    ELECTRIC POWER SYSTEMS RESEARCH, 1986, 11 (02) : 153 - 159
  • [50] SOME ASPECTS OF SYSTEM MODELING FOR THE ESTIMATION OF LIGHTNING PERFORMANCE OF HIGH-VOLTAGE SUBSTATIONS
    BICKFORD, JP
    SAVIC, MS
    IEE PROCEEDINGS-C GENERATION TRANSMISSION AND DISTRIBUTION, 1984, 131 (05) : 204 - 209