Case study of digital control systems for high-voltage substations

被引:0
|
作者
Propst, James [1 ]
Dood, Mike [1 ,2 ]
机构
[1] Western Area Power Adm, Huron, SD 57350 USA
[2] Schweitzer Engn Labs Inc, Pullman, WA 99163 USA
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper describes the design, implementation, and commissioning of a complete protection and control system retrofit project at a large transmission substation. Fort Thompson Substation, located in South Dakota, has two 345/230 kV step-down transformers with two 345 kV lines and twelve 230 kV lines. Western Area Power Administration (Western) undertook a project several years ago to completely renovate all the protection and control systems at this substation. They used the automation practices that Western had developed to reduce costs of new substation construction. While it is easy to cost justify integrating and automating systems when building a new substation, it is traditionally more difficult to justify automation system upgrade schemes when doing a renovation project. However, recent innovations in the integration capabilities of microprocessor-based protective relays, and other substation IEDs, make a complete integration system upgrade, including automation, cost effective compared to selective replacement of individual IEDs, wiring, and testing. This paper describes the justification and special challenges of automating an existing substation. It also discusses the overall system design concept of the integration and automation schemes that were employed. Topics covered in the paper include: Extensive use of fiber-optic cables to replace all control wiring in the yard Extensive use of multifunctional protection devices to eliminate wiring and equipment that would be required in a traditional design Replacement of hardwired lockout relays with "soft" logic Elimination of hardwired I/O to the RTU Project management tools used to ensure completion dates and to maintain budget Challenges of designing operator interface screens Impact on the workforce in migrating to a completely automated substation Insights gained in testing and commissioning the substation.
引用
收藏
页码:264 / +
页数:3
相关论文
共 50 条
  • [1] CONTROL OF HIGH-VOLTAGE SWITCHGEAR IN UNATTENDED SUBSTATIONS
    PIJAHN, M
    SIEMENS REVIEW, 1978, 45 (02): : 75 - 77
  • [2] CONTROL OF HIGH-VOLTAGE SWITCHGEAR IN UNATTENDED SUBSTATIONS
    PIJAHN, M
    SIEMENS ZEITSCHRIFT, 1977, 51 (04): : 273 - 275
  • [3] APPLICATION OF INTEGRATED DIGITAL CONTROL SYSTEMS IN HIGH VOLTAGE SUBSTATIONS.
    de Vries, J.J.P.
    Institution of Engineers, Australia, Electrical Engineering Transactions, 1980, EE 16 (02): : 39 - 47
  • [4] DESIGN OF HIGH-VOLTAGE SUBSTATIONS
    HAUSPURG, A
    SCHERER, HN
    IEEE TRANSACTIONS ON INDUSTRY AND GENERAL APPLICATIONS, 1966, IGA2 (04): : 286 - &
  • [5] Intellectual control system of switching devices of high-voltage substations
    Sarry, Sergey
    Nagay, Vladimir
    Kireev, Pavel
    Nagay, Ivan
    Trotsenko, Igor
    PROCEEDINGS OF THE 10TH INTERNATIONAL SCIENTIFIC SYMPOSIUM ON ELECTRICAL POWER ENGINEERING (ELEKTROENERGETIKA 2019), 2019, : 297 - 301
  • [6] DESIGN OF COMPUTER SYSTEMS FOR USE IN HIGH-VOLTAGE SUBSTATIONS.
    Dromey, G.
    Canadian Electrical Association, Engineering and Operating Division, Transactions, 1980, 19 (pt 5):
  • [7] METHODS FOR TRANSIENTS CONTROL IN SECONDARY WIRINGS OF HIGH-VOLTAGE SUBSTATIONS
    REMDE, HE
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1976, 95 (06): : 1768 - 1768
  • [8] EARTHING MEASUREMENTS IN HIGH-VOLTAGE SUBSTATIONS
    MATHIS, M
    GIMBER, B
    BROWN BOVERI REVIEW, 1987, 74 (04): : 221 - 228
  • [9] SHIELDING OF HIGH-VOLTAGE AND EXTRA-HIGH-VOLTAGE SUBSTATIONS
    MOUSA, AM
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1976, 95 (04): : 1303 - 1310
  • [10] Earthing systems of high-voltage substations: Present problems and methods for their solution
    Borisov, R.K.
    Balashov, V.V.
    Zharkov, Yu.V.
    Gorshkov, A.V.
    Kolechitskij, E.S.
    Elektrichestvo, 2001, (07): : 30 - 36