The Causal Effect of Bus Rapid Transit on Changes in Transit Ridership

被引:10
|
作者
Stewart, Orion T. [1 ]
Moudon, Anne Vernez [2 ]
Saelens, Brian E. [3 ,4 ]
机构
[1] Univ Washington, Seattle, WA 98195 USA
[2] Univ Washington, Architecture Landscape Architecture & Urban Desig, Seattle, WA 98195 USA
[3] Univ Washington, Pediat Psychiat & Behav Sci, Seattle, WA 98195 USA
[4] Seattle Childrens Res Inst, Seattle, WA USA
关键词
Longitudinal study; quasi-experimental; transportation system change; land use; DESIGN;
D O I
10.5038/2375-0901.20.1.5
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
Numerous studies have reported ridership increases along routes when Bus rapid transit (BRT) replaces conventional bus service, but these increases could be due simply to broader temporal trends in transit ridership. To address this limitation, we compared changes in ridership among routes where BRT was implemented to routes where BRT was planned or already existed in King County, Washington. Ridership was measured at 2010, 2013, and 2014. Ridership increased by 35% along routes where BRT was implemented from 2010 to 2013 compared to routes that maintained conventional bus service. Ridership increased by 29% along routes where BRT was implemented from 2013 to 2014 compared to consistent existing BRT service. These results provide stronger evidence for a causal relationship between BRT and increased transit ridership and a more accurate estimate of the independent effect of BRT on ridership.
引用
收藏
页码:91 / 103
页数:13
相关论文
共 50 条
  • [31] Effects of Transit Quality of Service Characteristics on Daily Bus Ridership
    Kashfi, Syeed Anta
    Bunker, Jonathan M.
    Yigitcanlar, Tan
    TRANSPORTATION RESEARCH RECORD, 2015, (2535) : 55 - 64
  • [32] A linear bus rapid transit with transit signal priority formulation
    Islam, Tarikul
    Vu, Hai L.
    Hoang, Nam H.
    Cricenti, Antonio
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2018, 114 : 163 - 184
  • [33] Transit Signal Priority Architecture for Bus Rapid Transit Systems
    Gomez-Londono, Rene
    Velasquez-Gomez, Andres G.
    Munoz-Tobon, Fabian L.
    2014 9TH COMPUTING COLOMBIAN CONFERENCE (9CCC), 2014, : 62 - 67
  • [34] Capital costs and ridership estimates of personal rapid transit
    Yoder, S.L.
    Weseman, S.E.
    DeLaurentiis, J.
    Transportation Research Record, 2000, (1704) : 58 - 70
  • [35] Capital costs and ridership estimates of personal rapid transit
    Yoder, SL
    Weseman, SE
    DeLaurentiis, J
    TRANSIT: RAIL TRANSIT AND MAINTENANCE, COMMUTER RAIL, MAJOR ACTIVITY CENTER CIRCULATION SYSTEMS, LIGHT RAIL TRANSIT, AND FERRY SERVICE: PUBLIC TRANSIT, 2000, (1704): : 58 - 67
  • [36] Simulation Model of Bus Rapid Transit
    Gunawan, Fergyanto E.
    Suharjito
    Gunawan, Alexander A. S.
    ICASCE 2013 - INTERNATIONAL CONFERENCE ON ADVANCES SCIENCE AND CONTEMPORARY ENGINEERING, 2014, 68
  • [37] Bus rapid transit as a neoliberal contradiction
    Paget-Seekins, Laurel
    JOURNAL OF TRANSPORT GEOGRAPHY, 2015, 48 : 115 - 120
  • [38] The Bus Rapid Transit investment problem
    Hoogervorst, Rowan
    van der Hurk, Evelien
    Schiewe, Philine
    Schoebel, Anita
    Urban, Reena
    COMPUTERS & OPERATIONS RESEARCH, 2024, 167
  • [40] The Bus Rapid Transit system in Taipei City - ridership forecast for the New Light Industrial Area in Neihu
    Chang, SKJ
    Du, JYL
    Wang, CK
    URBAN TRANSPORT VIII: URBAN TRANSPORT AND THE ENVIRONMENT IN THE 21ST CENTURY, 2002, 12 : 151 - 160