共 50 条
- [32] PRELIMINARY EVALUATION ON THE RELOCATION PHASE OF EX-VESSEL DEBRIS OF FUKUSHIMA DAIICHI NUCLEAR POWER PLANT UNIT-3 PROCEEDINGS OF 2021 28TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING (ICONE28), VOL 3, 2021,
- [35] DEVELOPMENT OF EX-VESSEL DEBRIS BED IN A FLOODED CAVITY WITH INCLINED BOTTOM STRUCTURE UNDER TWO-PHASE CONDITION PROCEEDINGS OF 2021 28TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING (ICONE28), VOL 2, 2021,
- [37] Estimation of long-term ex-vessel debris cooling behavior in Fukushima Daiichi Nuclear Power Plant unit 3 MECHANICAL ENGINEERING JOURNAL, 2022, 9 (02):
- [39] ESTIMATION OF LONG-TERM EX-VESSEL DEBRIS COOLING BY WATER IN FUKUSHIMA DAIICHI NUCLEAR POWER PLANT UNIT-3 PROCEEDINGS OF 2021 28TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING (ICONE28), VOL 3, 2021,
- [40] Study on mitigation of ex-vessel release of fission products in severe accidents for Chinese two loops PWR Cao, Xuewu, 1600, Elsevier Ltd (78):